Download Print this page

COMPULOAD CL2000MKII Series Installation, Calibration & Operation Manual page 4

Load weighing system
Hide thumbs Also See for CL2000MKII Series:

Advertisement

INSTALLATION PROCEDURE FOR THE COMPULOAD CL2000MKII
NOTE: - These basic installation instructions are given based
on the installer having previous experience in the servicing and
maintenance of machinery. General safety precautions should
be undertaken similar to carrying out maintenance on this type
of machinery. Inexperienced personnel should not undertake
this task if they are unsure of the safety precautions necessary.
FITTING THE COMPULOAD TO THE OPERATORS CABIN
*
Select a suitable location and using the mounting bracket as a
template, drill two holes and mount the bracket into position.
Allow room for the cable at the rear of the instrument
 DO NOT DRILL OR WELD ONTO ANY PORTION OF A
R.O.P.S. or F.O.P.S
A bracket however can be bolted onto a lock striker plate, window
frame aperture or turret support. Consider wiring and cabling
when choosing a mounting position. Consideration should also
be given so the instrument does not impede operator vision.
Vibration should also be taken into account so as not to damage
the machine
4

Advertisement

loading

Related Products for COMPULOAD CL2000MKII Series