User Manual
Hot Plate
5.2 Installation and Electric Connection
5.2.1 Installation (only valid for installation variants)
•
Put your device on a level and safe surface which stands the weight of the device.
•
Prepare the cut-out of the table according to our installation drawings and check the
cut-out. A silicone gap of 5 mm for wood and stainless-steel buffets all around the unit,
and a gap of 7 mm for stone and Dekton is mandatory. The maximum corner radius shall
not be wider than the silicon gap.
•
For Dekton (artificial stone) and stone plates please refer to the stone manufacturer's
references.
•
Now fix our mounting brackets which are available as accessories.
•
Make sure the surface is free from dust and grease.
•
Put your plate into the cut-out and adjust the accurate height with the adjusting screws.
Please make sure that the plate fits exactly.
•
Connect the controller and both cables to the circuit board according to the Connection
Plan.
•
Locate the plate in the middle of the cut-out.
•
Grout the plate with the original Höller silicone which is available in the accessories and
remove the excess silicone.
•
After a drying time of 24 hrs, you can connect the plate to the power supply and start to
operate.
NOTE regarding the Installation
•
The device must be installed in vertical position.
•
The built-in Hot Plates can be built-in flush-mounted or sunk in every top plate (wood, gran-
ite, corean or stainless steel).
ATTENTION!
The device must be installed by a qualified professional.
5.2.2 Electrical connections
•
The socket circuit must be secured according to the performance details.
•
Connect the controller to the electronical box.
•
Plug the Schuko plug into the socket.
- 12 -