Download Print this page

Advertisement

Quick Links

49 ½"
80 ¾"
Thank you for choosing Grain Wood Furniture, it is an honor to be in your home!
If you have any questions, feedback, or need replacement parts please contact us at:
grainwoodfurniture.com/help or
Shaker Collection
Full Panel Platform Bed
REV - 06/2021
Assembly Instructions
support@grainwoodfurniture.com
59 ¼"
Made in Brazil
2-person assembly
Model #
Finish
SH0201
Cherry
Expresso
SH0202
Walnut
SH0204
PH #2
page 1/9

Advertisement

loading
Need help?

Need help?

Do you have a question about the Shaker SH0201 and is the answer not in the manual?

Questions and answers

Summary of Contents for GrainWood Shaker SH0201

  • Page 1 Assembly Instructions 2-person assembly 49 ½” PH #2 80 ¾” 59 ¼” Model # Finish SH0201 Cherry Expresso SH0202 Walnut SH0204 Thank you for choosing Grain Wood Furniture, it is an honor to be in your home! If you have any questions, feedback, or need replacement parts please contact us at: grainwoodfurniture.com/help or support@grainwoodfurniture.com Shaker Collection...
  • Page 2 PLEASE READ BELOW BEFORE BEGINNING ASSEMBLY Enlist help from a friend or family member as most items require two Ÿ people for proper assembly. Choose a spacious, open area near where the piece will be located once Ÿ assembled. It is easier to move parts than to relocate the furniture after it is fully assembled.
  • Page 3: Hardware List

    HARDWARE LIST 16 + 1 3,5x16 12 + 1 3,5x35 16 + 1 1/4" 1/4"x110 7,0x70 16 + 1 10x50 30x30 12 + 5 ATTENTION Before starting assembly please verify the hardware set is complete. For missing hardware please contact us at grainwoodfurniture.com/help WARNING: CHOKING HAZARD...
  • Page 4 BOX A - 1 of 2 BOX B - 2 of 2 Part # Description Qty. Part # Description Qty. Footboard cross piece Right headboard post Left headboard post Headboard Headboard cross piece Right footboard post Left footboard post Slat roll Side rail Center rail Center support...
  • Page 5 THIS SIDE MADE IN BRAZIL C6 C6 C6 C6 Tip : Use a hammer in case dowels are hard to install by hand. 10x50 THIS SIDE B7+G8 MADE IN BRAZIL B7+G8 B7+G8 G8+B7 G8+B7 G8+B7 1/4" 1/4"x110 30x30 page 5/9...
  • Page 6 upper side 3,5x16 B7+G8 3,5x16 1/4" 1/4"x110 G8+B7 30x30 page 6/9...
  • Page 7 1/4" 1/4"x110 G8+B7 G8+B7 G8+B7 G8+B7 B7+G8 B7+G8 B7+G8 B7+G8 G8+B19 G8+B19 G8+B19 G8+B19 G8+B19 G8+B19 7,0x70 30x30 page 7/9...
  • Page 8 Attention: There are no predrilled holes for the A9 screws on part 09. 3,5x16 Attention: There are no predrilled holes for the A14 screws on parts 08 and 09. 3,5x35 page 8/9...
  • Page 9 Tip - Do not install wood caps in the back of the headboard posts. Instead save these 4 caps for eventual future use. Tip - Use a rubber mallet or a piece of wood to protect the finish when hammering the wood cap page 9/9...

This manual is also suitable for:

Shaker sh0202Shaker sh0204