SECURE TO CABINETRY VIA DRAWER REMOVAL (METHOD B)
5
6
16
Before refitting the drawer, ensure the
hoses are not twisted.
Refit the drawer to the runners and clip
into place via both locking tabs.
INSTALL PRE-FINISHED TOE KICK
1
2
3
4
min 1/2" (12mm)
Measure toe kick height against the
base of the lower tub.
Carefully score toe kick at
desired height.
Snap off excess toe kick material
and both end tabs.
Smooth the edges.
Slide toe kick onto the mounting rails
and secure. Ensure a 1/2" (12mm)
clearance is maintained between
the floor and the toe kick, the end
tabs can be used to measure this
if desired.
Do not over tighten the screws.