Download Print this page

Hanover 9820511 Assembly Instruction Manual

Balcony mini-greenhouse l120 x w120 x h169

Advertisement

Quick Links

Balcony Mini-Greenhouse
Assembly Instruction
Overall Size/cm: L120 x W120 x H169
Overall Size/inch: L47"x W47"x H66.5"
IMPORTANT
You must read these instructions carefully before you start assembly.
Please ensure that you find all parts in the correct type and
Please carry out the steps according to the instructions.
Do not tighten the steps until completing on
Keep the instruction manuals in a safe place for future reference.
quantity as mentioned in the list.
the assembly of the whole product.
9820511

Advertisement

loading

Summary of Contents for Hanover 9820511

  • Page 1 Balcony Mini-Greenhouse Assembly Instruction Overall Size/cm: L120 x W120 x H169 Overall Size/inch: L47"x W47"x H66.5" 9820511 IMPORTANT You must read these instructions carefully before you start assembly. Please ensure that you find all parts in the correct type and quantity as mentioned in the list.
  • Page 3 SAFETY ADVICE We strongly recommend the use of work gloves during assembly. Do not attempt to assemble the greenhouse in windy or wet conditions, Do not touch overhead power cables with the aluminum profiles. Always wear shoes and safety goggles when working with extruded aluminum.
  • Page 4 13.8" 26.5" 43.3" 29.7" 45.6" 45.7" 45.6" 41.8" 45.6" 41" 45.5" 41" 43.7" 12.7" 10.7" 41" 45" 33.2" 34"...
  • Page 5: Anchor Installation

    Anchor Installation Attach the anchor B5 to the corner of base B10. Base and Frame Assembly Make sure all holes are all in alignment and then fix B5 anchors onto B10 and D2 by F3 screws. Repeat the step to complete anchor installation for other 3 corners.
  • Page 6 Panels of platform B7 Installation Step I: Align holes for D2 and B7. Attach D2 & B7 with 12pieces F7 screws. Step II: Attach P6 onto B7 with 8 pieces F5 screws. Workbench Assembly Bottom of workbench P6 Installation...
  • Page 7 Step 1: Assemble B9 & B8 with 6pcs F5 screws. Workbench Assembly Step 2: Step 3: Attach B8 & B7 Attach B9 & P6 with 6pcs F5 screws. with 2pcs F5 screws. Don't lock F5 Install the last piece of wall panel B7 and the two frames D2 with 4 pcs F7 screws.
  • Page 8 Side & back wall panels Installation Water Pipes Installation Step 2: Step 1: Insert wall panels P8 into parts D2, Rotate and tighten the 2 water pipes G3. 2 pcs P8 panels for each wall. G3 water pipe kit is composed by 2 parts,including connecting head and pipe.
  • Page 9: Door Assembly

    Step 1: 1.Put the 2 pieces panels P7 together; 2.Make sure the two panels are against each other; 3.Assemble them together in the middle with 2 pieces F6 screws. Door Assembly Edge frame D1 installation. F6x6 Step 3: Installation for plastic door corner caps S2R,S2L and Step 2: fix them with 2 F6 screws.
  • Page 10 F5 x2 Installation for door sealer S10. Planform of D2 door frame 4 pieces,33" long. Cut the S10 adhesive stripe in Stick the 4 pieces on the inside surfaces of the 2 pieces front D2 according to figure I. Door Stopper Installation B3 There are 2 holes on parts B3.
  • Page 11 Silicon Installation for base frame of greenhouse. Silicon Silicon Step I: Place10 pieces F5 screws into the pre-drilled holes on the upper surfaces of B7 and mount the nuts but not fully locked. Don't fully tighten the F5 screws. Step II: Install the 1# profile by pushing it above B7 and ensure the tail of F5 screws inserting into Amplifying detailed figure.
  • Page 12 Step I: Place 10 pieces F4 screws into the pre-drilled holtes on 1# profiles but don't fully tighten them. Installation for the frame of greenhouse Step II: Inserting the tail of F4 screws into the frame profiles 3# of mini greenhouse. Don't fully tighten the F4 screws.
  • Page 13 Step I,II,III Pre-place 18 pieces F4 screws into 7#,9# and 5# parts. 1 piece F4 Step V Step IV Reinforcing rib 9# installation The distance between part 1# and part 5# must be 33cm/13". Fix the other end of part 9# on to part 1# with F8 screw.
  • Page 14 Step I: Roof frames installation Install panels P4L,P4R into posts 3# and 6#. Detailed cutting figure Side PC wall panels P4L & P4L installation Roof frames 4# installation Step III: Step II: Assemble roof profiles 4# to connectors 7#. Pre-place part B1 into the groove of profile 4#.
  • Page 15 Step I: Step II: Pre-embedding 2 pieces F4 screws in the holes at each end of roof beam 8#. Pre-place 2 pieces F4 screws in each of profile 4. Pre-pance 1 pieces F4 screws in each of profile 6. Installation for Roof Beam and Fixation Profiles Step IV: Step III: Moving the pre-embedded F4 screws...
  • Page 16: Roof Panel Installation

    Pre-place 2xF4 screws Inserting P3 PC panel into frame into the profile 10#. profiles 4 and cover the end edge with connecting profile 10. Roof Panel Installation Assemble profile 10 on Part B1 and lock them. -16- Install corner caps S8L & S8R.
  • Page 17 Bottom Window Middle Window Assembly for windows Step IV: Handle Installation 2 pieces F8 screws for one handle, Step III: 2 handles total. 1.Note the direction of W4; 2.Note the parts P4 & W1 are involved in the groove of W4. Step II: 1.Note the direction of W5;...
  • Page 18 Installation for rail 11# Insert rail profile 11# into the grooves of profile 10#. Roof corner plastic caps S3 installation. Attach Roof Corner Caps Part S3 to the crown of the roof using a screw part F3 on each side. -18-...
  • Page 19 Plastic end caps Installation Install S7L with 2 pieces F1 screws. Install S7R in same way. Install S9L with 2 pieces F1 screws. Install S9L with 2 pieces F1 screws. Install S9R in same way. Install S9R in same way. Install S5 with 1 piece F2 screws.
  • Page 20 Installing plastic parts S1,S1L and S1R Tighten all Nuts, Bolts, and Screws on the entire Greenhouse Your work is complete, Enjoy!!! -20-...
  • Page 21 Display how to open and close the window and door -21-...