Page 1
Overall Size/CM: L190 x W190 x H195 Overall Size/inch: L75"x W75"x H77" 9820101-1 9820101-2 Do not tighten the steps in the greenhouse until completing on the assembly of the polycarbonate panels.
SAFETY ADVICE We strongly recommend the use of work gloves during assembly. Do not attempt to assemble the Aluminum greenhouse in windy or wet conditions, Do not touch overhead power cables with the aluminum profiles. Always wear shoes and safety goggles when working with extruded aluminum. Dispose of all plastic bags safely and keep them out of reach of children.
Door Preparation Note: Lay the door frame on a flat surface. Make sure that door is square and even before tightening screws.
Page 7
Window Preparation Note:Make sure that the window is flat and even before tightening all screws.
Page 8
Screw Insertion Preparation Assemble the base 4-5-4-6 as shown on the next page Screw insertion preparation...
Page 9
Corner Posts Installation 1.Assemble upright 10R/10L for the bae panels. 2.Insert hex bolts in quantities shown.
Page 10
Back Wall Assembly & Installation 1.Attach panels P3-P5-P3 to base with S2. 2.Attach rails 12-15-12 to panelsP3-P3-P3. 3.Attach panels P4R-P6-P4L to rails 12-15-12. Hand tighten bolts as shown...
Page 11
Front Frame Installation 1.Assembly upright 9-9 for door frame. 2.Insert hex bolts in quantities shown. Assembly top of door frame...
Page 12
Front Wall Installation 1.Attach panels P3 to base with S2. 2.Insert hex bolts in quantities shown. 3.Attach rails 12-12 to panels P3 and P3. 4.Attach P4R,P4L,and P7 as shown. Install corner backs as shown. Do not fully tighten.
Page 13
Side Beams Installation 1.Install crossbars 8-8, hand tighten only. 2.Insert hex bolts in quantities shown. Insert every rim 16 as shown. Hand tighten hex bolts only.
Page 14
Roof Beam Installation Insert hex bolts in quantities shown. A.Install doorway corner braces where 13 and 16 meet using hex bolts. B.Install roof crown 17 using F4 bolts previously inserted (see detail on next page)
Page 16
Screw Insertion Preparation 1.Assemble remaining uprights(19) 2.Insert hex bolts(F4)in quantities shown. Please insert 4 screws in the two 20 profiles beside the window and insert 3 screws in other 20 profiles.
Page 17
Fastenings and Reinforcing Ribs Installation 1.Assemble the window base (B7-15) using bracket(B1). 2.Assemble corner brace to rails(17,20,26) as shown. 1.Assemble the six cross braces(22) and four cross braces(23) as shown using the pre-inserted hex bolt(F4).
Page 18
Side and Roof Panels Installation 1.Insert six P8 panels into S2 at the base. 1.Insert all roof panels (P9,P10). 2.Install gutter(25) to keep roof panels in place (see next page)
Page 19
Drain Profiles,Water Outlet and End Caps Assembly Finishing / Triming Insert two gutters (25) Using a water level or square to make sure that your greenhouse is straight and level. Tighten hex bolts at this time Install all end caps and trim.