Insulation; Suction Line; Liquid Line - Hussmann IMPACT D5RRI Operation And Service Manual

Rear roll-in dairy medium temperature free standing or suspended merchandisers installed in walk-in cooler exterior walls
Hide thumbs Also See for IMPACT D5RRI:
Table of Contents

Advertisement

R
2-2
EFRIGERATION

INSULATION

The suction and liquid lines should be clamped or
taped together and insulated for a minimum of
30 ft (9144 mm) from the merchandiser.
Additional insulation for the balance of the liquid
and suction lines is recommended wherever con-
densation drippage is objectionable or lines are
exposed to ambient conditions.

SUCTION LINE

Pitch in direction of flow.
May be reduced by one size at one third of
case run load and again after the second third.
Do not reduce below the case suction line
size.
Case suction lines should enter at the top of
the branch line.
Suction Line Return
8 Ft Case
(2438 mm)
P/N 0435045A
/ E
LECTRICAL
Offtime Defrost
12 Ft Case
(3658 mm)

LIQUID LINE

May be reduced by one size after one half the
case run load. Do not reduce below the case
liquid line connection size.
Take-offs to case liquid lines should exit the
bottom of the branch liquid line. Provide an
expansion loop for each evaporator take-off
(minimum 3 in. [76 mm] loop).
Minimum Loop
3-in. (76 mm)
Liquid Line Take Off
8 Ft Case
(2438 mm)
Liquid Line
Suction Line
12 Ft Case
(3658 mm)
.
.
WWW
HUSSMANN
COM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impact d5rris

Table of Contents