Vetter ManuTel Operation Manual page 23

Fork carrier with fork arms
Table of Contents

Advertisement

Assembly
Assemble the fork arms on the fork carrier in the following order:
1.
Prepare the lifting device for large loads, e.g., indoor crane and lifting straps. The
work must be carried out by 2 people.
2.
Move the fork carrier to the vertical position and move it to a height that allows for
safe and comfortable assembly of the fork arms.
3.
Remove the locking screw on the assembly side of the fork carrier.
Fig. 7: Locking device, fork arm with hook suspension
4.
Open the locking device of the fork arms. To do so, put the lever (Fig. 7/1) of the
locking device vertically upwards (Fig. 7/3).
5.
Secure the fork arm with the lifting device (e.g., using a crane and belts). Raise it
to a height that allows for the fork carrier to be enclosed by both hooks.
Fork carrier with fork arms
Assembly
Fork arms with hook suspension
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartfork

Table of Contents