INSTALLATION

Bolt Torque Specification
Size (in.)
1/4
5/16
3/8
1/2
5/8
3/4
7/8
1
1-1/8
1-1/4
* Valid for grade 5 coarse thread only
Mounting Instructions: Channel Mount
1.
Determine proper mounting location. Assure a
mounting angle greater than 20°, unless 'SP' type.
2.
Skip weld reinforcing bars to hopper. Do not weld
corners. NAVCO can recommend weld specifications if
required.
3.
Skip weld both channel legs to reinforcing bars. Do
not weld corners. NAVCO can recommend weld
specifications if required.
4.
Install vibrator and mounting bolts.
5.
Install lock washer (if included) and nut. Torque
mounting hardware to recommended specification
(see torque table at beginning of Section 3).
6.
Re-torque mounting hardware after 24 hours of
equipment operation.
CONTACT US TODAY AT
E.
SALES@NAVCO.US
W.
P.
832.467.3636
F.
®
VI BR ATOR CO.
Torque* (lbs.-ft.)
8
18
30
75
150
260
430
640
790
1120
NAVCO.US
A.
11929 Brittmoore Park Dr.
Houston, TX 77041
832.467.3800
Vibration Technology for Processing Bulk Materials
Mounting Considerations
Reinforcement plates are always recommended. The
reinforcement plate should match bin wall thickness up to 1/2".
A reinforcement plate of 1/2" thickness should be used on bin
walls exceeding 1/2" thickness. Refer to NAVCO installation
drawings for reinforcement plate dimensions.
If the hopper slope angle is greater than 70° from the horizontal,
a piston return spring is recommended to ensure positive
starting action (BH 1.62 through BH 6.00 only).
Vibrator(s) should be located according to NAVCO bin map or
installation drawing.