NAVCO BH Series Operation Manual page 10

Bin hopper vibrator
Table of Contents

Advertisement

NAT IO NAL A IR
Mounting Instructions: T-Slot Mount
1.
Determine proper mounting location. Assure a
mounting angle greater than 20°, unless 'SP' type.
2.
Skip weld reinforcing plate to hopper. Do not weld
corners. NAVCO can recommend weld specifications if
required.
3.
Skip weld t-slot to reinforcing plate. Do not weld
corners. NAVCO can recommend weld specifications if
required.
4.
Insert bolts in slots and position vibrator onto t-slot.
5.
Install lock washer (if included) and nut. Torque
mounting hardware to recommended specification
(see torque table at beginning of Section 3).
6.
Re-torque mounting hardware after 24 hours of
equipment operation.
Typical Air Control Package Arrangement
CONTACT US TODAY AT
E.
SALES@NAVCO.US
W.
P.
832.467.3636
F.
®
VI BR ATOR CO.
NAVCO.US
A.
11929 Brittmoore Park Dr.
Houston, TX 77041
832.467.3800
Vibration Technology for Processing Bulk Materials
Page 10

Advertisement

Table of Contents
loading

Table of Contents