Operations Instructions:
1.
Install air control package (See Installation
Section).
2.
Fill the lubricator with recommended lubricant (See
Lubrication Section).
3.
Set the pressure regulator to 50 psi.
4.
Open Valve.
5.
Adjust the lubricator to approximately 10 drops of
oil per minute.
6.
Allow vibrator to operate for five minutes.
7.
Inspect and re-torque ALL mounting fasteners and
air line connections.
8.
Adjust air regulator for the lowest pressure that will
give the desired material flow performance, NOT to
exceed 60 psi.
CONTACT US TODAY AT
E.
SALES@NAVCO.US
W.
P.
832.467.3636
F.
®
VI BR ATOR CO.
NAVCO.US
A.
11929 Brittmoore Park Dr.
Houston, TX 77041
832.467.3800
Vibration Technology for Processing Bulk Materials
Maintenance Instructions:
1.
Check automatic lubricator and fill with
recommended oil type if level is low (See
Installation Section).
2.
Check to see that air pressure is correctly set
for most efficient operation. If filter is installed
in system, drain to remove contaminants (water,
scale, etc.).
3.
Check all air connections and tighten if necessary.
4.
Torque any bolts that may have been loosened
over a period of time (maintenance/plant-
shutdown).
5.
Be certain that vibrator is well lubricated at all
times. One way to check this is to place hand over
exhaust while running. A thin film of oil on the palm
of the hand will confirm that the vibrator is being
lubricated properly.