Hoshizaki KML-200MAE Service Manual page 13

Modular crescent cuber
Hide thumbs Also See for KML-200MAE:
Table of Contents

Advertisement

2nd Cycle and after with pump drain
IMPORTANT
Freeze cycle time is limited to 60 minutes
even if Float Switch does not open.
1. Float Switch opens and signals to complete
freeze cycle.
10/20 second Drain Timer starts counting.
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
,
& LINE VALVE
13
2. Drain Timer stops counting.
3. Thermistor reads 48° F.
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
IMPORTANT
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
Pump drain is completed
Defrost Timer (adjustable
from 1 to 3 minutes) starts
counting.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kml-200mwe

Table of Contents