Selection Of Dowels (With Floor Covering) - Nußbaum Hebetechnik 2.30 SL E Operating Instruction And Documentation

Table of Contents

Advertisement

Pic. 21: choice of the dowel length with floor pavement or tile surface
Table to picture 21.
Dowel type
Drilling depth
Min. anchorage depth b 100 mm (80 mm for version with base frame bow)
Thickness of concrete c at least 200 mm (or at least 150 mm for version with base frame)
Diameter of bore
Thickness of the
lift-pieces
with bottom
starting torque
number of dowels
Operating Instruction and Documentation
Liebig B20; UPAT UMV 100 (or UMV80 for version with base
frame bow) or equal dowels of other manufacturer (with licence)
a according to dowel manufacturer
d according to the dowel manufacturer
e+f
depending of floor pavement (f = 15mm)
according to dowel manufacturer
12 piece (16 piece by using additional installation strap)
- 31 -
2.30 SL E

Advertisement

Table of Contents
loading

Related Products for Nußbaum Hebetechnik 2.30 SL E

Table of Contents