Maintenance; Maintenance Schedule Of The Automotive Lift - Nußbaum Hebetechnik 2.30 SL E Operating Instruction And Documentation

Table of Contents

Advertisement

6. Maintenance

A regular service has to be performed every three months by the lifts operator
according to the following schedule. If the lift is in continuous operation or dirty
environment, the maintenance rate has to be increased.
During daily operation the lift has to be watched carefully for its correct function.
In case of any malfunction the technical service of the retailer has to be in formed.

6.1 Maintenance schedule of the automotive lift

d,e,f clean and grease the pull-outs of the carrying arms, bolts of the pads and slide
ways of the carriage sliding blocks.
b
Oiling the spindle and the lubricating felt between the carrying nut and the
centring of the spindle one time a month with a thin oil as SAE15W40.
Attaching twice lifting and lowering the lift in the end position. After lifting
and lowering the lift with load.
The lubricating interval has to be carried out at every maintenance. If the lift is
in continuous operation, the maintenance rate has to be increased.
The nut between the column (c) and the covering (g) will greased with an oil
can.
The regular complete lubrication in the mentioned distances
secures the absolutely easy operation for the lift.
Do not use an biodegradable adhesive oil for greasing the spindle.
A normal adhesive oil impaired the qualities of the lift. We recommend a thin
Oil: for an example SAE15W40.
A over-lubrication or greasing with grease of the spindle through a intensive
lubrication supplies reduce the degree of effectiveness of the lift.
f
check the rubber pads, otherwise exchange it.
h
grease sequence nut one time a month with multipurpose fat. Use boring at
lifting carriage. (remove the cover)
a
grease the spindle bearing annually with multipurpose.
Operating Instruction and Documentation
2.30 SL E
Pic.3: lubrication plan
- 14 -

Advertisement

Table of Contents
loading

Table of Contents