Onyx DX15 Operator's Manual

Onyx DX15 Operator's Manual

Battery autoscrubber

Advertisement

Quick Links

BATTERY AUTOSCRUBBER
OPERATOR MANUAL
DX15 BATTERY AUTOSCRUBBER
This Guide provides necessary instructions on machine operation and
maintenance. Before operation or use of this machine, please carefully
read and understand this Guide.

Advertisement

Table of Contents
loading

Summary of Contents for Onyx DX15

  • Page 1 BATTERY AUTOSCRUBBER OPERATOR MANUAL DX15 BATTERY AUTOSCRUBBER This Guide provides necessary instructions on machine operation and maintenance. Before operation or use of this machine, please carefully read and understand this Guide.
  • Page 2: Table Of Contents

    TABLE OF CONTENTS Parts Ordering 12605 Commerce Station Drive • Suite 700 Warranty Claims Huntersville, NC 28078 Technical Support 704.827.9368 Protect the Environment Safety Precautions Website: https://www.onyxsolutions.store/ Machine Components No further notice will be given for possible change of specification and parts. Machine Unpacking Machine Installation Instructions Machine Information:...
  • Page 3: Parts Ordering

    Machine IPL’s can be found at the top of the SHOP page of the ONYX website. Before matching parts All operators must read, understand and observe the following safety precautions.
  • Page 4: Machine Components

    SAFETY PRECAUTIONS MACHINE COMPONENTS 2. Before starting the machine: -Please ensure that all safety equipment have been in place and operated correctly. 1. Handle 2. Model Label 3. When using the machine: 3. Squeegee Assembly - please walk slowly when encountering the slope and sliding surface. 4.
  • Page 5: Machine Unpacking

    MACHINE INSTALLATION MACHINE INSTALLATION Machine Unpacking 4. Before connecting the battery, please firstly ensure whether the electrodes and electric terminals are clean. Use electrode cleaning fluid and wire brush as required. 1. Please carefully check whether there is damage on the packing box of the machine. If there is, please immediately reflect to the carrier.
  • Page 6: Pre-Operational Examination

    MACHINE INSTALLATION MACHINE INSTALLATION Installation of Brush/Scouring Pad 4. Do not operate the machine on the slope with a slope over 5% (3°). For safety, please move slowly on slope or skid surface. Explanation: As for the brush and scouring pad suggested for use, please refer to the section of [Informa- 5.
  • Page 7: Battery Charging

    MACHINE INSTALLATION MACHINE MAINTENANCE Battery Charging Only by indeed following daily, weekly and monthly maintenance procedure can the machine be kept in the optimum working state. Note: To prolong the life of the battery and ensure the optimum efficiency of the machine, the battery must be charged after the use time of the machine exceeds 30min.
  • Page 8: Machine Transport

    MACHINE TRANSPORT TROUBLE SHOOTING GUIDE When transporting the machine with truck or trailer, please ensure to following the following binding Problem Reason Solution procedure: 1. Lift up the brush head to the transport position Charge the battery The battery has no power 2.
  • Page 9: Technical Parameters

    YL = Yellow GY = Gray GN = Green BL = Blue PR = Purple PK = Pink OG = Orange CY = Cyan Note: Colors may Vary Link to Wiring Schematic PDF file on ONYX Website Support Page: https://www.onyxsolutions.store/support...
  • Page 10 NOTES NOTES...
  • Page 11 onyxsolutions.com...

Table of Contents