TABLE 9. Operational And Checkout Procedures
Final phases of this installation are the unit Operational and Checkout Procedures. To obtain proper performance,
all units must be operated and charge adjustments made in accordance with procedures found in the Service Facts
of the Outdoor Unit.
After installation has been completed, it is recommended that the entire system be checked against the following list:
Be sure unit suspension(if used) is secure and that
1.
thereare no tools or loose debris in or around or on
top of the unit......................................................
2. Properly insulate suction lines and fittings. .........
3. Properly secure and isolate all refrigerant lines...
4. Verify that all electrical connections are tight. .....
TABLE 10: Electrical Data:
Model
18AC/T
18HP/T
24/T
30/T
18/C
24AC/C
30AC/C
24HP/C
NOTES: 1.AC: Air Conditioner;
2.T: Toshiba Compressor; C: Copeland Compressor; L: LG Compressor
32
[ ]
[ ]
[ ]
[ ]
Minimum Circuit Ampacity(A)
9.0
9.4
11.6
16.0
11.9
17.6
18.4
17.5
HP: Heat Pump; No description:Air Conditioner & Heat Pump.
5.Check all duct outlets; they must be open and unrestricted.
6.Check drain lines and be sure all joints are tight...............
7.Be sure that a return air filter is installed. ..........................
8.Operate complete system in each mode to verify proper
performance. Verify operation of supplementary electric
heater. ...............................................................................
Maximum Circuit Protector(A)
15
15
20
25
20
30
30
30
[ ]
[ ]
[ ]
[ ]