Troubleshooting An Ac Power Subsystem - Cisco XR 12404 Installation Manual

Cisco systems router installation guide
Table of Contents

Advertisement

Troubleshooting an AC Power Subsystem

Troubleshooting an AC Power Subsystem

Cisco XR 12404 Router Installation Guide
4-6
AC PEMs provide –48 VDC OUTPUT. The +5 VDC OUTPUT from the CSF
powers the MBus module on each card in the system. The MBus module, in turn,
control the DC-DC converters also present on each card in the system. The
DC-DC converter takes –48 VDC from the power supply and converts it into +2.5,
+3.3 and +5 VDC, which is distributed to the card circuitry.
AC PEMs are monitored by the MBus module and the RP for over- or
undervoltage and over- or undercurrent conditions.
Begin checking the power subsystem by first looking at the LEDs on the power
supply. The INPUT OK LED on an AC PEM lights when AC power is applied;
the OUTPUT OK LED lights when the PEM power switch is turned on.
Figure 4-1
shows the location of the LEDs on the AC PEM (item 5).
Figure 4-1
AC PEM
1
2
6
1
AC PEM handle
2
On/Off switch
3
Bail Latch
Chapter 4
3
IN PU T
O UT PU
IN PU T
T
O UT PU
O K
T
O K
10 0- 24 0V
FA IL
12 A
50 /8 0H Z
5
4
4
Power cord receptacle
5
LEDs
6
Captive screws
Troubleshooting the Installation
OL-13830-02

Advertisement

Table of Contents
loading

Table of Contents