Grant Aerona 3 R32 Installation Manual page 10

Table of Contents

Advertisement

Please Check all the following before start the unit:
The system has been connect hydraliclly as per the schematic
The system has been wired in accordance with the manufactures instructions.
Check that a adquately sized Expansion vessel is fitted to the system and Safety relief
valve.
Make sure a Filteration system has been fitted, that meets Grants requiremennt.
Make sure the system has been flushed correctly.
The system has been filled and vented and the correct Antifreeze protection level
achieved.
Please find below an illustration of the Grant Aerona 3 controller:
W:
www.seconrenewables.com
Prestart Checks
Controls
T: 0191 516 6554
E:
info@seconrenewables.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpd6r32Hpid10r32Hpid13r32Hpid17r32

Table of Contents