ActronAir Bulkhead 2 Installation And Commissioning Manual

ActronAir Bulkhead 2 Installation And Commissioning Manual

Multi split system air conditioner

Advertisement

Bulkhead 2
Multi Split System Air Conditioner
Installation and Commissioning Guide
Model Numbers
BRE-026CS
BRE-035CS
BRE-050CS
BRE-070CS
IMPORTANT NOTE:
Please read this manual carefully before installing or operating your air conditioning unit. Make sure to save this manual for
future reference.
CAUTION:
The system is charged with flammable refrigerant, safety checks are necessary to ensure that the risk of ignition is minimised.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bulkhead 2 and is the answer not in the manual?

Questions and answers

Summary of Contents for ActronAir Bulkhead 2

  • Page 1 Bulkhead 2 Multi Split System Air Conditioner Installation and Commissioning Guide Model Numbers BRE-026CS BRE-035CS BRE-050CS BRE-070CS IMPORTANT NOTE: Please read this manual carefully before installing or operating your air conditioning unit. Make sure to save this manual for future reference.
  • Page 2: Table Of Contents

    14. Test Run ............................21 This manual is a controlled document which contains confidential and proprietary information. Distribution, modification, copying and/or reproduction are prohibited without written consent from ActronAir Product design and specifications are subject to change without prior notice for product improvement.
  • Page 3: Symbols

    Check your air conditioning unit and all items against the invoice upon receiving your shipment. Inspect the unit, components and accessories for any sign of damage. If there is any damage to the unit, contact ActronAir Customer Care Department immediately on: 1300 522 722 to obtain a Goods Return Number.
  • Page 4: Safety Instructions

    Gold Hydrophillic Coat Coil Protection heat exchangers ensures an enhanced heat transfer with increased performance efficiency. System Flexibility The ActronAir air conditioning units are the first choice for residential, office, schools and other air conditioning facilities applications, both for new construction or retrofitting projects. Refrigerant Handling and Accountability ActronAir strongly urges that all service technicians make every effort to eliminate the emission of refrigerants to the atmosphere.
  • Page 5 The air conditioner’s circuit board (PCB) is designed with a fuse to provide over current protection. The fuse specifications, T5A/250VAC is printed on the circuit board For the units with R-32 refrigerant , only the blast-proof ceramic fuse can be used. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 6: Installation Information

    • Do not install the unit close to an area where there is a danger of fire due to volatile, explosive, flammable and/ or hazardous materials. • Ensure that spaces around the unit are free from any obstructions for optimum unit performance. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 7: Components

    3000 (also known as Australian Wiring Rules). NOTE This indoor unit is designed to match only with the ActronAir outdoor unit as specified in the Technical Selection Catalogue. This unit is designed for use with R-32 refrigerant only. The unit is supplied with factory charged R-32 refrigerant. Be aware of all the relevant regulations concerning the handling of refrigerant.
  • Page 8: Installation Overview

    Charging Refrigeration System Refer to Multi Elite Installation Manual (Outdoor Unit) Refer to Multi Elite Installation Manual for more details (Outdoor Unit) for more details Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 9: Indoor Units Parts

    AIRFLOW It is strongly encouraged to have a removable service access panel underneath the indoor SERVICE ACCESS AREAS unit to carry out maintenance and repair. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 10: Indoor Unit Dimensions

    1140 CAUTION This indoor unit is designed to match only with the ActronAir outdoor unit as specified in the Technical Selection Catalogue. This unit is designed for use with R-32 refrigerant only. The unit is supplied with factory charged R-32 refrigerant. Be aware of all the relevant regulations concerning the handling of refrigerant.
  • Page 11: Indoor Unit Installation

    Washer Hanging screw bolt screw bolt Hanging screw bolt Supporting Hanging angle steel bolts Page 21   Page 21   Installation and Commissioning Guide - Bulkhead 2 Split System Screw nut Doc. No. 9590-5011 Ver. 1 211217 Shockproof cushion...
  • Page 12: Duct And Accessories Installation

    • Insulation foam must be wrapped outside the duct to avoid condensate. An internal duct under layer can be added to reduce noise, if the end-user requires. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 13: Adjust The Air Inlet Direction

    All the figures in this manual are for demonstration purposes only. They may be slightly different from the air conditioner you purchased. 10.04. Fresh Air Duct Installation Dimension: Duct joint for fresh air Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 14: Motor And Drainpipe Maintenance

    Drain Pump Maintenance: 1. Unplug pump power supply and water level switch cable. 2. Remove four screws from drain pump.. 3. Take off pump. Pump Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 15: Drainpipe Installation

    • Incorrect installation could cause water to flow back into the unit and flood. • To prevent air bubbles, keep the drain hose level or slightly tilted (< 75mm). Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 16 1-1 1-1.5m Lean over 1/50 NOTE When drilling the wall hole, make sure to avoid wires, plumbing, and other sensitive components. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 17 (1 min lag is possible, according to the length of the drain pipe), and check whether the water leaks from any of the connection points. 3. Power off the air conditioner and reinstall the cap. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217 Page 12...
  • Page 18: Wiring

    • While connecting the wires, please strictly follow the wiring diagram. • The refrigerant circuit can become very hot. Keep the interconnection cable away from the copper tube. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 19 Field wiring by Installer 1mm² (2 CORE + EARTH) of AS/NZS 3000 'Australia/New Zealand Wiring Rules" for more details. N(L2) INDOOR UNIT Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 20: Wiring Diagram

    Bulkhead Split System Installation and Commissioning Guide 13. Wiring Diagram TO OUTDOOR UNIT CN15 CN34 CN40 CN10 Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 21: Test Run

    If the unit malfunctions or does not operate according to your expectations, please refer to the Troubleshooting section of the Owner’s Manual before calling customer service. Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 22 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 23 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Installation and Commissioning Guide - Bulkhead 2 Split System Doc. No. 9590-5011 Ver. 1 211217...
  • Page 24 ©Copyright 2021 Actron Engineering Pty Limited ABN 34 002767240. ®Registered Trade Marks of Actron Engineering Pty Limited. ActronAir is constantly seeking ways to improve the design of its products. Therefore, specifications are subject to change without notice. Installation and Commissioning Guide - Bulkhead 2 Split System...

This manual is also suitable for:

Bre-026csBre-035csBre-050csBre-070cs

Table of Contents