Cisco 7505 Quick Start Manual page 21

Cisco systems router quick start guide
Table of Contents

Advertisement

Install Field Replaceable Units (FRUs)
Check the RSP Installation
Step 1
Check the RSP connections to make sure
they are secure:
The RSP is inserted all the way into its slot, and
both the captive installation screws are
tightened.
The console terminal is turned on and is
connected to the console port.
Step 2
Observe the RSP LEDs. While the system
initializes, the CPU halt LED on the RSP
stays on. It goes off when the boot process
is complete. As the RSP initializes each
interface processor, the status LEDs on
each interface processor go on and off in
irregular sequence.
Step 3
Verify that the console terminal displays
the system banner and startup screen as
the system restarts.
Step 4
Verify that all the enabled LEDs (on the
interface processors) are on.
Step 5
When you have verified all the conditions
in Step 1 through Step 4, the installation is
complete.
If you replaced the RSP and saved your configuration
file to a remote server before doing so, proceed to the
"Retrieve the Configuration File for RSPs" section
on page 23.
An error condition exists if no LEDs go on at power
up or after initialization, or if the boot error or CPU
halt LEDs go on and remain on. If this happens, see
Appendix A in the Cisco 7500 Series Installation and
Configuration Guide.
19

Advertisement

Table of Contents
loading

Table of Contents