Mitsubishi Electric MUZ-DW25VF-E1 Service Manual page 56

Table of Contents

Advertisement

OPERATING PROCEDURE
6. Removing the compressor and 4-way valve
(1) Remove the cabinet and panels. (Refer to section 1.)
(2) Remove the inverter assembly. (Refer to section 2.)
(3) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows 0 kg/cm
(4) Detach the brazed part of the suction and the discharge pipe
connected with compressor.
(5) Remove the compressor nuts.
(6) Remove the compressor.
(7) Detach the brazed part of pipes connected with 4-way valve.
© Copyright 2021 MITSUBISHI ELECTRIC CORPORATION
Issued: Dec. 2021. No. OBH906 REVISED EDITION-A
Published: Oct. 2021. No. OBH906
Made in Japan
2
(0 MPa).
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
PHOTOS/FIGURES
Photo 9
Discharge pipe
brazed part
Discharge
temperature
thermistor
Specifications are subject to change without notice.
56
Suction pipe
brazed part
Brazed parts of 4-way valve

Advertisement

Table of Contents
loading

Table of Contents