Mitsubishi Electric MUZ-DW25VF-E1 Service Manual page 52

Table of Contents

Advertisement

OPERATING PROCEDURE
6. Removing the compressor and the 4-way valve
(1) Remove the cabinet and the panels. (Refer to section 1.)
(2) Remove the inverter assembly. (Refer to section 2.)
(3) Remove the screws of the reactor and remove the
reactor.
(4) Remove the screws of the separator and remove the
separator.
(5) Remove the soundproof felt.
(6) Remove the terminal cover and the compressor lead
wire.
(7) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure
gauge shows 0 kg/cm
(8) Detach the brazed part of the suction and the dis-
charge pipe connected with the compressor.
(9) Detach the brazed part of pipes connected with the
4-way valve.
(10) Remove the nuts of compressor legs.
(11) Remove the compressor.
7. Removing the LEV assembly
(1) Detaching the brazed part of pipes connected with
LEV valve.
OBH906A
Screw of
R.V. coil
2
(0 MPa).
Discharge
pipe
brazed
part
52
PHOTOS/FIGURES
Photo 10
R.V. coil
Brazed parts of LEV valve
Suction pipe
brazed part
Brazed parts of
4-way valve

Advertisement

Table of Contents
loading

Table of Contents