Summary of Contents for X Training Equipment COMPETITION FREESTANDING RIG
Page 1
COMPETITION FREESTANDING RIG ASSEMBLY GUIDE X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 2
OVERVIEW Congratulations on your new Freestanding Rig! The X Training Equipment® Pull-up Rig is the centerpiece to your gym, we are proud to offer a number of freestanding and wall-mounted rig configurations to fit your needs. Our rigs are designed to be modular and can be uprgraded or re-configured as your business expands.
WHAT’S INCLUDED The list below displays the quantity of each part included based on the length of your pull-up rig. Please review your inventory of parts upon receipt and let us know if you have any discrepencies. 10FT 14FT 20FT 24FT 30FT 34FT...
Page 5
ASSEMBLIES The diagram below shows how many how many of each assmebly type is needed based on the rig length. ASSEMBLIES NEEDED 10FT 14FT 20FT 24FT 30FT 34FT 40FT 44FT X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 6
J-Cup Spacing Side Spacing Reapeat this step for the other side of the assembly 4ft Pull-up Bar M12 Washer 9ft (108”) M12 Nuts Upright Beam 4ft Crossbeam M12 Bolt X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 7
Connect the two sides of your assembly from Step One together using two 6ft Pull-up Bars and two 6ft Crossbeams. Place Pull-up bars to desired heights 6ft Pull-up Bar M12 Washer M12 Nuts 6ft Crossbeam M12 Bolt X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 8
4 5 6 STEP THREE With your partners, carefully tilt the rig into it’s upright position. Repeat Steps One and Two for every Squat Station your rig has. See ‘Assemblies’ page for reference. X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 9
1 2 3 STEP FOUR Once all of the Squat Stations have been assembled, connect them together using 6ft Pull-up bars. M12 Washer 6ft Pull-up Bar M12 Nuts M12 Bolt X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 10
Once assembled, tilt up with your partners and bolt to the end of your rig. Example: 20FT 6ft Pull-up Bar M12 Washer 9ft (108”) Upright Beam M12 Nuts 6ft Crossbeam M12 Bolt X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 11
To fully secure the rig, bolt it to the floor using the provided Concrete Anchors. This step will vary depending on your structure. Contact a qualified contractor for additional help. 14mm Concrete Anchors X Training Equipment • support@xtraining.com • (877) 348-7464...
Page 12
COMPLETE Congrats, your Pull-up Rig is now complete! It is important to check your bolts are securly tightened before every use. X Training Equipment • support@xtraining.com • (877) 348-7464...
Need help?
Do you have a question about the COMPETITION FREESTANDING RIG and is the answer not in the manual?
Questions and answers