Pre-Requisites - Dell 210-APGV Installation Manual

Hide thumbs Also See for 210-APGV:
Table of Contents

Advertisement

WIFI front panel LED call-outs
rNDC front panel LED call-outs
NOTE:
rNDC port LED behavior can be found in their respective datasheets.
Table 4. Expansion card LEDs
LED
rNDC, WIFI, BLE card system status LEDs
rNDC, WIFI, BLE card temperature status LED
WIFI operating modes
BLE operating modes

Pre-requisites

NOTE:
For detailed installation instructions, see
The following is a list of components required for successful platform installation:
VEP4600 platform
AC country- and regional-specific cables to connect the AC power source to each of the platforms' AC power supplies
Two-post rail kit mounting brackets for rack installation, included
Screws for rack installation
#1 and #2 Phillips screwdrivers, not included
M2 Philips drive flat head screwdriver, not included
Ground cable screws (included) for L-bracket—order separately
M3 ground lug assembly kit screw, depending on your platform
Description
Off—Card is off
Solid green—Normal operation
Solid yellow—Citical card error
Flashing green—Booting
Flashing yellow—Noncritical card error
Off—Card is off
Solid green—Normal temperature operation
Solid yellow—Temperature is at the limit
Flashing yellow—Temperature is over the limit
Solid green - radio is on
Off—radio is off
Solid green - radio is on
Off—radio is off
Site preparations
and
VEP4600
installation.
VEP4600 platform
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emc vep4600

Table of Contents