Haier AP96NACAEA Operation Manual page 19

Cabinet unit
Hide thumbs Also See for AP96NACAEA:
Table of Contents

Advertisement

Installation procedure
2. Piping connection of indoor unit
Arrangement of piping and drainage pipe
Cut away, with a hammer or a saw, the lid for piping according to piping direction.
Insulation material
Copper tube
According to the piping method, connect the piping on indoor unit with union of connecting pipe.
Arrange the piping as per the wall hole and bind drain hose connecting electric cable and piping
together with polyethylene tape.
Insert the bound piping connecting electric cable and drain hose through wall hole to connect with
outdoor unit.
Arrangement of drain hose
Drain hose shall be placed in under place.
There should be a slope when arrange drain hose. Avoid up and down waves in drain hose.
Indoor unit
Slope
If humidity is high, drain pipe( especially in room and indoor unit ) must be covered with
insulation material.
After opening inlet grill, you will see a control
box as shown in the Fig.
Remove the cover before working.
Connecting electric cable
for indoor and outdoor unit
Good
Drain hose
18
Outdoor unit
Up
Down
Bad

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Au96nataea

Table of Contents