Selection of installation site

It should be installed at places where it is firm enough to withstand the weight of the air conditioner
to prevent falling.
Typhoon and earthquake prevention. It should be installed according to specific requirements.
Inasppropriate installation may lead to accidents.
Installtion space
(1)During installation, connect the outdoor unit and align
the mounting surface(See the figure on the right).Mount
the electric distribution device on the external side of
the unit in accordance to the installation instructions for
electric distribution device.
(2)To ensure good performance of the machine and facili-
tate installation and maintenance, adequate space must
be reserved (See figure on the right).
Note: Obstacles should be 2000mm off the top of the out-
door unit. Obstacles nearby should be 400mm lower
than the top of the unit.
1. Handing
As there is no protective package for the outdoor unit,so
the following points merit attention:
(1) When forklift is used, insert the fork into the holes in
the base plate.
(2) When crane is used, lift the unit with 4 pieces of steel
rope with diameter above 6 mm.
(3) Put protective materials between the cable and the
unit to prevent deformation and damage of the surface.
2.Mounting
(1) The distance between two connections must not be
less than 20mm.
Warning
Absorb in
Absorb in
Over
Over
20mm
20mm
Protection cushion
20
Outdoor unit
Blow out
Absorb in
Working, repair surface
Over 300mm
Over
Over
1000mm
20mm
(front side)
Wire rope
Base panel
M12 foot screw bolt
4 screws each unit
Over 20mm
Wire rope