Hydraulic Plan 2; Hydraulic Plan 3 - Vaillant auroMATIC 560 Operating And Installation Manual

Solar differential control
Table of Contents

Advertisement

Available languages

Available languages

5 Electrical installation
5.3

Hydraulic plan 2

Kol 2
Kol 1
Kol1-P
Kol2-P
Fig. 5.7 Hydraulic plan 2 with system configuration: Two collec-
tor arrays, one solar cylinder, option for connecting dif-
ferent heaters for reheating the cylinder
Designation in the
Component
hydraulic plan/con-
nection diagram
I, II
Option for connecting to different heaters
for reheating the cylinder
C1 C2
Connections for controlling the heating ap-
pliances for recharging the cylinder
HZ-K
Heating circuit(s)
KW
Cold water
EP
Electric heating element (optional)
Kol1-P
Solar circuit pump 1
Kol2-P
Solar circuit pump 2
Kol 1
Collector sensor 1
Kol 2
Collector sensor 2
Ertrag
Yield
LegP
Legionella protection pump
Sp1
Cylinder sensor 1
Sp2
Cylinder sensor 2
S
Contactor
Table 5.5 Key to Fig. 5.7 and Fig. 5.8
12
230V
2
S
SP1
Ertrag
Sp2
EP
C1 C2
C1 C2
1
230V
KW
Designation in the
Component
hydraulic plan/con-
nection diagram
1
Contactor control for optional electric heat-
ing element
2
400 V connection, 3-phase
230 V
230 V mains connection
F1 (T4)
Fuse holder
VC/VK
Connection area for boiler
Table 5.5 Key to Fig. 5.7 and Fig. 5.8 (continuation)
H
Danger
Risk of scalding by hot water
It is imperative that the mixer valve is fitted to
ensure protection from scalding.
Installation Manual auroMATIC 560 0020060907_00
I
II
C1 C2

Advertisement

Chapters

Table of Contents
loading

Table of Contents