Vaillant auroMATIC 560 Operating And Installation Manual page 64

Solar differential control
Table of Contents

Advertisement

Available languages

Available languages

5 Electrical installation
Hydraulic plan 1: Connection of a second cylinder or a
swimming pool
Sp3
Fig. 5.3 Hydraulic plan 1: Connection of a second cylinder or a
swimming pool
Designation in the
Component
hydraulic plan/con-
nection diagram
C1 C2
Connections for controlling the heating ap-
pliances for recharging the cylinder
Hg
Boiler
KW
Cold water
ZP
Circulation pump
EP
Electric heating element (optional)
SR
Customer-side swimming pool controller
LP/UV 1
Diverter valve
UV 1 in unpowered state
A
Alternative connection for second cylinder
Kol1-P
Solar circuit pump 1
Kol 1
Collector sensor 1
Ertrag
Yield
LegP
Legionella protection pump
Sp1
Cylinder sensor 1
Table 5.3 Key to Fig. 5.3 and Fig. 5.4
8
Kol 1
Kol1-P
LP / UV 1
SR
Sp3
A
230 V
1
2
S
Sp1
Ertrag
LegP
Sp2
EP
ZP
Designation in the
Component
hydraulic plan/con-
nection diagram
Sp2
Cylinder sensor 2
Sp3
Cylinder sensor 3
S
Contactor
1
Contactor control for optional electric heat-
ing element
2
400 V connection, 3-phase
230 V
230 V mains connection
F1 (T4)
Fuse holder
VC/VK
Connection area for boiler
Table 5.3 Key to Fig. 5.3 and Fig. 5.4 (continuation)
H
Danger
Risk of scalding by hot water
It is imperative that the mixer valve is fitted to
ensure protection from scalding.
Installation Manual auroMATIC 560 0020060907_00
C1 C2
KW

Advertisement

Chapters

Table of Contents
loading

Table of Contents