Sleipner PRO SEP80 Installation Manual

Sleipner PRO SEP80 Installation Manual

Dc electric thruster
Hide thumbs Also See for PRO SEP80:

Advertisement

Quick Links

SLEIPNER AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
Installation Guide
For Pro DC Electric Thruster Models
SEP80, SEP100, SEP120, SEP130, SEP150
DOCUMENT ID:
2728
REVISION:
15
DATE:
2022
EN
LANGUAGE:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PRO SEP80 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sleipner PRO SEP80

  • Page 1 Installation Guide For Pro DC Electric Thruster Models SEP80, SEP100, SEP120, SEP130, SEP150 DOCUMENT ID: SLEIPNER AS 2728 REVISION: P.O. Box 519 DATE: N-1612 Fredrikstad 2022 Norway LANGUAGE: www.sleipnergroup.com...
  • Page 2: Table Of Contents

    SEP120/215T-24V - SEP120 Tunnel thruster, 24V SEP130/250T-24V - SEP130 Tunnel thruster, 24V SEP130/250T-12V - SEP130 Tunnel thruster, 12V SEP150/215T-24V - SEP150 Tunnel thruster, 24V Sleipner Motor AS P.O. Box 519, Arne Svendsensgt. 6-8 N-1612 Fredrikstad, Norway MC_0020 SEP 80 & 100 & 120 & 130 & 150...
  • Page 3: Responsibility Of The Installer

    Sleipner products. The recommendations given in this document are guidelines ONLY, and Sleipner strongly recommends that advice is obtained from a person familiar with the particular vessel and applicable regulations.
  • Page 4 Sleipner products. If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated Sleipner supplied interface, you are still required to install at least one original Sleipner control panel to enable efficient troubleshooting if necessary.
  • Page 5: Thruster Measurements

    Thruster Measurements MC_0124 *100 *100 *120 *130 *130 Measurement Measurement description code inch inch inch inch inch inch inch Internal tunnel diameter 7,28 7,28 7,28 7,28 8,46 9,84 9,84 Motor Height 13,86 13,54 15,47 15,47 15,51 15,67 15,67 Width 9,92 10,28 11,50 10,71...
  • Page 6: Thruster Specifications

    - Flexible coupling between electro-motor and drive shaft protects electro motor and gear system if propeller jams. - Original Sleipner panels shut off automatically 6 minutes after last use. This interval can be adjusted in 5 min steps up to 60 minutes or turned off completely.
  • Page 7: Positioning Of The Tunnel / Thruster

    Positioning of the tunnel / thruster MC_0003 Aim to install the thruster as far forward as possible (1) Due to the leverage effect around the boats’ pivot point. The distance difference from the boat pivots’ point to the thruster will determine the amount of real rotation power for the boat.
  • Page 8: Tunnel Length

    Tunnel Length MC_0003 Optimal tunnel length Achieving the correct tunnel length depends on many factors from the hull type, operation and environmental conditions. Tunnels should avoid being longer than 4 x the tunnel diameter as this will reduce thruster performance. (NB: Installing long length tunnels can flex/ bend over time and may require additional support.
  • Page 9: Tunnel Installation In Sailboats

    Tunnel installation in Sailboats MC_0003 Some sail boats have a flat bottom and shallow draft in the bow section. This can make installing the thruster as far forward from the boats main pivot point diffi cult. (Fig. 1). However, it is possible to install a tunnel thruster in most sail boats, even when the hull does not directly support the fi tting of a tunnel. Instead fi...
  • Page 10: Water Deflection

    Water Deflection MC_0003 A possible problem in sail boats or fast powerboats is that a non-rounded surface can generate drag from the back face of the tunnel, as it creates a “flat” area facing the flow of water. This problem can be solved in two different ways, depending on what is possible or easier to perform. The best solution which generally reduces the most drag is to make a recess in the hull at the back of the tunnel.
  • Page 11: Tunnel Ends

    Tunnel Ends MC_0003 Rounded tunnel ends will maximise thrust and minimise noise and cavitation. For best performance round the tunnel connection to the hull-side as much as possible. The minimum rounding has a radius of 10% of the diameter of the tunnel.
  • Page 12: Tunnel Installation

    Tunnel Installation MC_0003 IMPORTANT We recommend that a professional does the fi breglass, steel or aluminium fi tting of the tunnel. These instructions are only general instructions and do not explain in any way the details of fi breglass work. Problems caused by faulty installation of the tunnel, are the installers full responsibility.
  • Page 13 Tunnel Installation MC_0003 With tunnel installed and cast. Round the edges with a radius of 10% of the tunnel diameter. For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter. (NB: If this is not possible, round the tunnel end as much as possible.) Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area Follow the same method if making the deflector/ spoiler.
  • Page 14: Stern Tunnel Installation

    Stern Tunnel Installation MC_0003 For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery Installation Guide For DC Electric Thruster Models SE80, SE100, SE120, SE130, SE150 Stern Thruster SLEIPNER AS DOCUMENT ID: 222222 REVISION: P.O. Box 519...
  • Page 15: Gear Leg & Motor Bracket Installation

    Gear Leg & Motor Bracket Installation MC_0001 ! Please refer to the graphic for special considerations relating to your model ! Mark the tunnel centreline and the boat’s centreline. (NB: Install the gear leg and propeller as shown above for the thrust direction to correspond with the control panel.
  • Page 16: Propeller Installation

    Propeller Installation MC_0018 ! Please refer to the graphic for special considerations relating to your model ! Centre the drive pin and Insert the propeller onto the shaft spine. Rotate the propeller until the drive pin aligns with the internal slot in the propeller.
  • Page 17: Motor Installation

    Motor Installation MC_0019 ! Please refer to the graphic for special considerations relating to your model ! Install the motor onto the motor bracket ensuring the couplings are engaged together correctly (top and bottom). (NB: The motor can be placed in all directions on the motor bracket.
  • Page 18: Thruster Electrical Installation

    Thruster Electrical Installation MC_0035 ! Please refer to the graphic for special considerations relating to your model ! Information of electrical table. - All power cable lengths represent the total length of the combined (+) and (-) cables. - Battery capacity is stated as minimum cold crank capacity, (CCA). - Use slow blow rated fuses to hold stated Amp-Draw for min.
  • Page 19: Electrical Specifications

    Cable Length Specifi cations MC_0044 <7m 7-14m 15-21m 22-28m 28-35m 36-45m Nominal System Min. battery Rec. total + & - total + & - total + & - total + & - total + & - total + & - Model Size current Voltage...
  • Page 20: Technical Wiring Diagram

    Technical Wiring Diagram To PPC grey blue 8-Way connector Multi cable to PPC white pink (Opt.) Thruster motor To PPC MG_0062 SEP 80 & 100 & 120 & 130 & 150 2728 2022...
  • Page 21: S-Link System Description

    MC_0120 S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables as a common power and communication bus with separate SPUR Cables to each connected unit. Units with low power consumption are powered directly from the S-Link bus therefore one power cable must be connected to the BACKBONE Cable through a T-Connector.
  • Page 22: Control Panel Cable Installation

    (NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until it receives a single signal or thrust in one direction.) • Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup. See the Control panel manual for more information. PJC 212...
  • Page 23: Control Panel Installation

    Control Panel Installation MC_0398 For Control Panel installation please refer to the supplied manual in your Sleipner product delivery Installation Guide Control Panel SLEIPNER AS DOCUMENT ID: P.O. Box 519 REVISION: DATE: N-1612 Fredrikstad Norway www.sleipnergroup.com LANGUAGE: SEP 80 & 100 & 120 & 130 & 150...
  • Page 24: Pre-Delivery Checklist

    Pre-delivery Checklist MC_0033 []..The bolts holding the gear house and motor bracket together are tightened correctly. []..The bolts holding the motor to its bracket are tightened correctly. []..All electrical connections are clean, dry and tight, and the correct cable, fuse and main switch size.
  • Page 25: Service And Support

    Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented visit our website www.sleipnergroup.com/patents SEP 80 & 100 & 120 & 130 & 150...
  • Page 26 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP 80 & 100 & 120 & 130 & 150 2728 2022...
  • Page 27 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP 80 & 100 & 120 & 130 & 150 2728 2022...
  • Page 28 © Sleipner Group, All rights reserved The information given in the document was right at the time it was published. However, Sleipner Group cannot accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi...

Table of Contents