I N S T A L L A T I O N , O P E R A T I O N A N D M A I N T E N A N C E M A N U A L
9. After the pump has been running for 10 minutes with steady leakge, tighten the
gland nuts by one sixth of full turn. Continue to adjust at ten minute intervals, each
time evenly by one sixth of full turn, until leakage is reduced to an acceptable level.
there should be leakage of 60 to 80 drops per minute.
CAUTION:
Excessive gland pressure will cause damage by cutting off lubrication to the packing and
packing will burn and damage the sleeve.

9. BILL OF MATERIALS.

Part no
1
Key-Coupling
2
Bearing Housing-DE
3
Deflector
4
Insert-NE / NDE
5
Upper Casing
6 #
Impeller
7
Key-Impeller
8 #
Wear ring
9 #
Shaft Sleeve-NE /NDE
10 #
Pump Shaft
11
Lantern Ring
12 #
Gland packing
13
Shoulder Ring
# Marked parts are recommended mandatory spares.
24 |
P a g e
Part name
Part no
14
Bearing Housing-NDE
15
Lock Nut
16 #
Ball Bearing
O ring –Sleeve
17 #
18
Lower casing
19 #
O ring-Insert
20
Gland
21 #
Oil seal
22 #
Mechanical seal
23
Flushing pipe
24
Grease Nipple
25
Air Cock