Jaypro CARBON ULTRALITE Installation And Operating Instructions Manual page 8

3” od net system
Table of Contents

Advertisement

PVB-9500 Jaypro Carbon Ultralite 3" OD Net System Instructions
5. Fasten anchor strap assembly to non-winch pole with the button head scre,
spacer, and acorn nut as shown below.
6. Install net extension cords to the winch strap and anchor strap assembly and
install carabiners to the free ends of net extension cords (Figure 6-3).
Figure 6-3: Install net extension cord to anchor side.
Figure 6-2: Anchor strap installation.
- 7 of 9-
UPDATED 12/12/2018

Advertisement

Table of Contents
loading

Table of Contents