ECR International Dunkirk DCB-75 Installation, Operation & Maintenance Manual page 93

Condensing wall mounted gas fired boiler
Table of Contents

Advertisement

LABOR SAVING PIPING MANIFOLDS / NEAR BOILER PIPING CONNECTIONS
115 & 150 COMBI
H
B
A
I
MANIFOLD 205
F
E
C
D
G
J
H
B
A
I
LEGEND
A
Pressure Gauge
B
Pressure Relief Valve
C
Heating Return Connection
D
Domestic Cold Water Inlet
E
Gas Shutoff Connection
F
Boiler Fast Fill
G
Domestic Hot Water Outlet
H
Condensate Drain Connection
I
Heating Supply Connection
J
Manifold
5 gpm DHW Flow Restrictor
K
(Factory installed) (205 only)
5
205 COMBI
K
G
D
E
J
115 & 150
-
30.00 psi [2.11 bar]
3/4" [22.2 mm] 1" [25.4 mm]
1/2"
[15.9 mm]
3/4" [22.2 mm]
External to
Boiler
1/2"
[15.9 mm]
13/16" [21 mm]
ID Hose
3/4" [22.2 mm] 1" [25.4 mm]
1-1/4" sweat
1-1/2" sweat
[31.8 mm]
NA
PN 240011430 REV. Q [03/15/2022]
C
205
3/4" NPT
NA
3/4" NPT
3/4 NPT
[38.1 mm]
3/4" NPT

Advertisement

Table of Contents
loading

Table of Contents