www.ti.com
User's Guide
BQ25792EVM, BQ25798EVM and BQ25798BKUPEVM
(BMS034) Evaluation Module
This user's guide describes the characteristics, operation, and functionality of the BQ25792 and BQ25798
Evaluation Module (EVM). It will also describe the equipment, test setup, and software required to operate the
EVM. A complete schematic diagram, printed-circuit board (PCB) layouts, and bill of materials (BOM) are also
included in this document.
Throughout this user's guide, the abbreviations and terms EVM, BQ2579XEVM, BMS034, and evaluation
module are synonymous with the BQ25792EVM, BQ25798BKUPEVM, and BQ25798EVM.
p
Hot surface! Contact may cause burns. Do not touch!
Some components may reach high temperatures >55°C when the board is powered on. The user must
not touch the board at any point during operation or immediately after operating, as high temperatures
may be present.
1
Introduction.............................................................................................................................................................................3
1.1 EVM Features....................................................................................................................................................................
Descriptions..................................................................................................................................................................4
2 Test Setup and Results..........................................................................................................................................................
2.1 Equipment..........................................................................................................................................................................
Setup................................................................................................................................................................6
Setup...................................................................................................................................................................7
2.4 Test Procedure...................................................................................................................................................................
3 PCB Layout Guidelines........................................................................................................................................................
4.1 BMS034 Board Layout.....................................................................................................................................................
Materials.................................................................................................................................................................22
5 Revision History...................................................................................................................................................................
Section............................................................................................................................................10
Figure 2-5. Icon Guide...............................................................................................................................................................
Figure 2-6. Chip Configuration...................................................................................................................................................
Figure 2-7. Charger Configuration.............................................................................................................................................
SLUUCB5E - JUNE 2020 - REVISED JULY 2022
Submit Document Feedback
ABSTRACT
Table of Contents
Materials..................................................................................................................15
List of Figures
Charging..................................................................................................7
Section......................................................................................................................................9
Section......................................................................................................................................12
Copyright © 2022 Texas Instruments Incorporated
WARNING
Table of Contents
3
6
6
6
9
14
15
19
25
10
10
11
11
13
1
Module
Need help?
Do you have a question about the BQ25792EVM and is the answer not in the manual?
Questions and answers