Starting The Ae Xxx Optical Receiver - LANGER EMV-Technik A100 User Manual

Optical fibre probe
Table of Contents

Advertisement

LANGER
DE-01728 Bannewitz
mail@langer-emv.de
EMV-Technik
www.langer-emv.com
Figure 9 AS 100 connected to the DUT; position the AS 100 on the IC package if there isn't enough free space above
GND

3.2 Starting the AE XXX optical receiver

- Connect the AE XXX to the oscilloscope (BNC plug).
- The receiver output supplies a zero-delay voltage of 10 V independent of the measuring range
that is selected on the AS XXX. Thus, the vertical deflection on the oscilloscope should be
0.5-2 V/div.
- Connect the power supply to AE XXX (plug-in power supply unit)  lower LED "ON" must be on.
Connect Sensor and receiver with the optical fibre  upper LED "Sync" must be on. Loose the
clamped joint on the receiver, insert the optical fibre completely and slightly fasten the loose joint.
connectors and
Figure 10 AE 300
- The oscilloscope must show an output voltage and/or signal form that corresponds to that applied
to the sensor input.
displays
- 8 -
A100 / A200 / A300

Advertisement

Table of Contents
loading

Related Products for LANGER EMV-Technik A100

Table of Contents