Rear Panel; Dgs-1100-05Pdv2; Front Panel - D-Link DGS-1100-05PDV2 User Manual

Smart managed switch
Hide thumbs Also See for DGS-1100-05PDV2:
Table of Contents

Advertisement

1 Product Introduction

Rear Panel

Power: Input for a 5V/1A AC adapter.
Reset: Press the Reset button for 1 to 5 seconds to reboot the Switch. Press the Reset button for 6 to10
seconds to reset the Switch back to the default settings. The LED will light up solid amber for 2 seconds.
When pressing the Reset button for longer than 10 seconds, the device will enter loader mode and the LED
will light up solid green for 2 seconds. If the device cannot reboot, it will automatically enter loader mode.
Alternatively, you can press Reset to power up the device and enter loader mode.
Kensington Lock: This is used to attach a physical Kensington security lock.
GND: This is used to connect the Switch to ground.

DGS-1100-05PDV2

2-Port 10/100/1000Mbps PoE and 3-Port 10/100/1000Mbps with 1 PD port Smart Managed Switch.

Front Panel

Power LED: The Power LED lights up when the Switch is connected to a power source. If the Power LED is
Blinking, PoE Pass Through is Off.
Link/Act/Speed LED (Ports 1-5):
Flashing: Indicates a network link through the corresponding port.
Blinking: Indicates that the Switch is either sending or receiving data to the port.
Green: Indicates that the port is running at 1000M.
Amber: Indicates that the port is running at 10/100M.
Light off: No link.
PoE PSE LED (Port 1-2):
Solid Green: PD device insert and power feeding.
Solid Amber: PD device insert but failure occurs.
Light off: No PD device insert.
PoE PD (Port 5):
Solid Green: Receiving power from PSE per 802.3at.
Solid Amber: Receiving power from PSE per PSE.
Light off: No link.
Reset: Press the Reset button for 1 to 5 seconds to reboot the Switch. Press the Reset button for 6 to10
seconds to reset the Switch back to the default settings. The LED will light up solid amber for 2 seconds.
When pressing the Reset button for longer than 10 seconds, the device will enter loader mode and the LED
will light up solid green for 2 seconds. If the device cannot reboot, it will automatically enter loader mode.
Alternatively, you can press Reset to power up the device and enter loader mode.
Figure 1.2 – DGS-1100-05V2 Rear Panel
Figure 1.3 – DGS-1100-05PDV2 Front Panel
CAUTION: This equipment can be connected only to PoE
networks without routing to the outside plant.
D-Link Smart Managed Switch User Manual
3
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1100-05v2Dgs-1100-08v2Dgs-1100-08pv2

Table of Contents