DGS-3000-28SC Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide
1. Make sure that the ON/OFF toggle switch on the rear panel of the Switch is turned off.
2. Connect one end of the DC power cords supplied to a DC power source that will be activated when the AC
power is not working. Make sure that connection polarity (positive and negative) is correct at both sides before
using this feature to avoid any damaged.
3. Connect the other end of the DC power cords to the DC power source connector.
4. Connect the DC power source connector to the switch.
5. Turn the ON/OFF toggle switch on.

Installing Power Cord Retainer

To prevent accidental removal of the AC power cord, it is recommended to install the power cord retainer together with
the power cord.
Figure 2-4 Connecting a DC power source to the Switch