Opening The Detector - Honeywell QuadBand Triple IR FS24X Installation And Operating Manual

Multi-spectrum infrared electro-optical multi-spectral digital wideband ir sensor
Table of Contents

Advertisement

2.2

Opening the Detector

It is necessary to remove the Detector Module puck from the enclosure to access the field connections.
CAUTION: Disconnect power before
1. Loosen the set screw on the enclosure lid
(see Figure 2-6).
2. Turn counterclockwise (CCW) to unscrew
the enclosure lid (see Figure 2-7).
Honeywell
unscrewing the Housing Lid.
Installation and Operating Manual
Figure 2-6
Figure 2-7
10

Advertisement

Table of Contents
loading

Table of Contents