Page 1
VINYL MAILBOX POST WITH NO-DIG STEEL ZP19013 PIPE ANCHOR KIT 60 MIN Approximate assembly time Want to see a video on how to assemble this product? Scan the QR code Mailbox and mounting hardware not included WWW.ZIPPITY-OUTDOOR.COM VER. 110520 WWW.ZIPPITY-OUTDOOR.COM...
Page 2
If you experience any further trouble with your product, please contact our customer service department. nychgroup.com/parts support@zippity-outdoor.com 704-892-5222 877-234-6196 Customer service agents are available to take calls weekdays from 8am- 5pm EST. If you call outside of business hours, please leave a voicemail.
Page 3
Post Arm (1) 5" x 5" x 25½" 1” Stainless Steel Screw (2) Post Trip Cap (1) Post (1) 4" x 4" x 56" Pipe Anchor (1) Base Molding (1) 1¼” Stainless Steel Screw (5) 1⅛" Diamerter x 46¾" WWW.ZIPPITY-OUTDOOR.COM...
Page 4
Orient correctly to receive newspaper. STEP 2.3 Slide post trim cap into position under post arm as illustrated. Install a 1 ¼” screw as illustrated beneath post trim cap. This will prevent post trim cap from sliding down the post. WWW.ZIPPITY-OUTDOOR.COM...
Page 5
6” intervals as you pound the pipe into the ground. Usually, after the pipe is about 18” into the ground, the trajectory of the pipe is established, and you cannot straighten it. 10 lb Sledgehammer WWW.ZIPPITY-OUTDOOR.COM...
Page 6
INSTALL MAILBOX POST OVER PIPE ANCHOR STEP 4: STEP 4.1 Orient vinyl post correctly and slide the assembled unit over the pipe and at least 3” into the ground. Slide the base molding down to the ground as illustrated. WWW.ZIPPITY-OUTDOOR.COM...
Page 7
Install post cap (A). Push down on cap to lock to vinyl post. ½” Fasten (2) 1” stainless steel screws through the back of the mailbox post as shown. Screw should be the same height as previously measured in step 3.2. WWW.ZIPPITY-OUTDOOR.COM...