Installing The Control Panel; Replacing The Oven Burners (Optional) - Bosch HGD745256N Instructions For Connecting

Gas and gas conversion
Hide thumbs Also See for HGD745256N:
Table of Contents

Advertisement

Available languages

Available languages

You can use the table to determine the new bypass screws
2.
that you will need after the gas conversion. See the section
entitled "Technical properties - gas".
Check whether the seals on the bypass screw are correctly
3.
seated and work precisely. Only use bypass screws with
intact seals.
Insert the new bypass screws and tighten them. Make sure
4.
that all bypass screws are connected to the correct shut-off
valves.
At this point, it is essential to carry out a leak test. See the
5.
section entitled "Leak test".

Installing the control panel

Install in reverse order.
Grip the panel with both hands and slowly fit it into place.
1.
Ensure that the cables are not damaged and the connections
do not come loose. Lower it slightly and place it in the
fastening lugs.
Reinsert the screws (T15) (M4) which were removed from the
2.
panel.
Reinsert and tighten the screws (T20) which were removed
3.
from the front profiles on the right and left. Refit the plastic
cover.
Carefully reinstall the hob. Make sure that the plastic parts
4.
which must remain underneath the screws do not fall out.
Screw the two screws (T20) on the front left and right on the
hob back in.
For models with wok burner (optional): Screw the 4 Torx
5.
screws (M4) which you removed from the wok burner back
in.
If the appliance has a hob cover, hold it vertically by both
6.
sides and slowly reinsert it into the holder.
Install the burner bases in their respective positions
7.
according to their size. Make sure that the ignition plugs are
placed in the appropriate openings next to the burner bases.
Place the burner lids in the centre of the matching burner
bases.
Refit the pan support grid or wire rack. Ensure that the pan
8.
support with a span of 80 mm is fitted on the auxiliary burner.
Fit the control knobs carefully.
9.
At this stage, you must check the burning behaviour of the
10.
gas burners. See the section "Safe burning behaviour".
Check whether the appliance is functioning correctly.
11.

Replacing the oven burners (optional)

Preparation
Turn off all switches on the control panel.
Shut off the gas supply.
:
Risk of electric shock!
Interrupt the power supply to the appliance.
Replacing the nozzle for the oven burner
Open the oven door.
1.
Loosen the front securing screw in the bottom plate.
2.
Hold the bottom plate firmly at the front, lift and remove it.
3.
Loosen the burner securing screw and carefully remove the
4.
oven burner. The burner nozzles are now freely accessible.
Make sure that the thermocouple and ignition plug
connections are not damaged.
Release the nozzle at the burner access on the rear side of
5.
the oven (using a 7 mm socket wrench).
You can use the table to determine the new nozzle that you
6.
will need after the gas conversion. See the section entitled
"Technical properties - gas".
Insert and tighten the new nozzle.
7.
At this point, it is essential to carry out a leak test. To perform
8.
a leak test, see the section entitled "Leak test".
Replace the oven burner, making sure that the thermocouple
9.
and ignition plug connections are not damaged. Retighten
the securing screw.
At this point, it is important to check the burner flame
10.
formation. See the section entitled "Correct flame formation".
Replace the bottom plate.
11.
7

Advertisement

Chapters

Table of Contents
loading

Table of Contents