Unpacking And Inspecting The Switch - Cisco Nexus 9300-FX Hardware Installation Manual

Table of Contents

Advertisement

Installing the Switch Chassis
• Ensure that the site power meets the power requirements for the switch. If available, you can use an
• Ensure that circuits are sized according to local and national codes. Typically, this often requires one or

Unpacking and Inspecting the Switch

Before you install the switch, be sure to unpack and inspect the switch for damage or missing components.
If anything is missing or damaged, contact your customer service representative immediately.
Tip
Keep the shipping container in case the chassis requires shipping at a later time.
Before you begin
Before you unpack the switch and before you handle any switch components, be sure that you are wearing a
grounded electrostatic discharge (ESD) strap. To ground the strap, attach it directly to an earth ground or to
a grounded rack or grounded chassis (there must be a metal-to-metal connection to the earth ground).
Step 1
Compare the shipment to the equipment list provided by your customer service representative and verify that you have
received all items, including the following:
• Accessory Kit
• Rack-Mount Kit
Note
For the contents of these kits, see the
Step 2
Check for damage and report any discrepancies or damage to your customer service representative. Have the following
information ready:
• Invoice number of shipper (see packing slip)
uninterruptible power supply (UPS) to protect against power failures.
Caution
Avoid UPS types that use ferroresonant technology. These UPS types can become
unstable with the switch, which can have substantial current draw fluctuations
because of fluctuating data traffic patterns.
both of the following:
• AC power supplies typically require at least a 15-A or 20-A AC circuit, 100 to 240 VAC, and a
frequency of 50 to 60 Hz.
Caution
To prevent loss of input power, ensure the total maximum loads on the circuits
supplying power to the switch are within the current ratings for the wiring and
breakers.
Additional
Kits.
Cisco Nexus 9348GC-FXP ACI Mode Hardware Installation Guide

Unpacking and Inspecting the Switch

13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 9348gc-fxp

Table of Contents