Lamp Installation - KING RH Series Installation Manual

Overhead short wave electric infrared heater
Table of Contents

Advertisement

SW2
Series

Lamp Installation

Disconnect power prior to installing or replacing supplied quartz lamp(s). The elements can and
should be installed prior to mounting the heater.
Ensure appliance is OFF and is cool to the touch.
1
Remove both service access panels using a 1/4" nut driver.
2
Open lamp retains by firmly rotating the retainers on both sides of the unit (see Figure 2.5).
3
Position heating elements in "U" slots and firmly press the connector end into the clip(s), one end at
4
a time. Avoid handling the quartz glass as much as possible.
Rotate the lamp retainer into closed position.
5
Repeat steps 3 through 5 until all heating elements have been installed.
6
After heating elements have been installed, the quartz glass should be wiped off with alcohol using a
7
clean cloth.
Reinstall the service access panels.
8
Figure 2.5
Lamp Installation
Element
Cap
NOTE: RH series heaters are designed for use with quartz lamp infrared heating elements only. They
are NOT intended to be used with straight metal rod heating elements. Replace lamps with parts
from Detroit Radiant Products Company only!
CAUTION
!
End caps must be in good
electrical contact with fuse
clip/lamp snap retainer.
13
2.0
Installation
Lamp Installation
"U" Slots

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsh1215Rh-33b1-c25w

Table of Contents