Assembly & Set-Up Instructions; Unpacking The Container - Boss Industrial 3PT34T25 Owner's Manual

Horizontal / vertical 3-point hitch 22, 28, 34 ton log splitter
Hide thumbs Also See for 3PT34T25:
Table of Contents

Advertisement

ASSEMBLY & SET-UP INSTRUCTIONS

UNPACKING THE CONTAINER

WARNING! Use extreme caution unpacking this machine. Some components are very heavy and will require
additional people or mechanical handling equipment.
NOTE: All references in this manual to the left or right side and front or back of the log splitter are from the operating
position only. Exceptions, if any, will be specified.
Unpacking tools needed:
1. Wrench 14mm
2. Scissors or knife
3. Pry bar or claw hammer
Step 1: Use a 14mm wrench to remove all the bolts and washers on the metal crate, put aside the packing top and side
frames, then remove the cardboard box. See FIGURE 3.
(FIGURE 3)
Cardboard box
Beam / Frame Top Assembly
Page 10
Crate Bottom
Crate Top
Flat Washer x 48PCS
Crate Side Frame x 8PCS
Hex Head Bolt
x 48PCS
Page 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

3pt28t253pt22t253pt35t253pt22te

Table of Contents