Step 8 Performing The Gas Leak Test; Step 9 Insulating The Refrigerant Pipes - Samsung AC024KN4DCH Installation Manual

Hide thumbs Also See for AC024KN4DCH:
Table of Contents

Advertisement

Installation Procedure
CAUTION
• Connect the indoor and outdoor units using pipes
with flared connections (not supplied). For the lines,
use insulated, unwelded, degreased and deoxidized
copper pipe (Cu DHP type to ISO 1337 or UNI EN
12735-1), suitable for operating pressures of at least
4.2 MPa (609.2 psi) and for a burst pressure of at
least 20.7 Mpa (3002.3 psi). Copper pipe for hydro-
sanitary applications is completely unsuitable.
• For sizing and limits (height difference, line length,
max. bends, refrigerant charge, etc.) see the outdoor
unit installation manual.
• All refrigerant connection must be accessible, in order
to permit either unit maintenance or removing it
completely.
• If the pipes require brazing, make sure that oxygen
free nitrogen (OFN) is flowing through the system.
• Nitrogen blowing pressure range is 0.02 to 0.05 Mpa
(2.9 to 7.25 psi).

Step 8 Performing the gas leak test

To identify potential gas leaks on the indoor unit, inspect
the connection area of each refrigerant pipe using a leak
detector for R-410A.
Before recreating the vacuum and recirculating the
refrigerant gas, pressurize the whole system with
nitrogen (using a cylinder with a pressure reducer) at a
pressure above 4 MPa [594.7 psig (gauge)] in order to
immediately detect leaks on the refrigerant fittings.
Made vacuum for 15 minutes and pressurizing system
with nitrogen.
Insulator
12
English
Step 9 Insulating the refrigerant
pipes
Once you have checked that there are no leaks in the
system, you can insulate the piping and hose.
1 To avoid condensation problems, place Acrylonitrile
Butadien Rubber separately around each refrigerant
pipe.
No gap
NOTE
• Always make the seam of pipes face upwards.
2 Wind insulating tape around the pipes and drain hose
avoiding compressing the insulation too much.
3 Finish wrapping insulating tape around the rest of the
pipes leading to the outdoor unit.
4 The pipes and electrical cables connecting the indoor
unit with the outdoor unit must be fixed to the wall
with suitable ducts.
Indoor unit
Gas side
Liquid side
NBR
Insulation cover pipe
Insulation pipe
Be sure to overlap
the insulation.

Advertisement

Table of Contents
loading

Table of Contents