Samsung AE090JXEDEH Installation Manual

Samsung AE090JXEDEH Installation Manual

Air to water outdoor unit
Hide thumbs Also See for AE090JXEDEH:

Advertisement

Quick Links

Air to Water Heat Pump
Outdoor Unit
installation manual
imagine
Thank you for purchasing this Samsung product.
the possibilities
AE090JXEDEH
AE120JXEDEH
AE140JXEDEH
AE160JXEDEH
AE090JXEDGH
AE120JXEDGH
AE140JXEDGH
AE160JXEDGH

Advertisement

Table of Contents
loading

Summary of Contents for Samsung AE090JXEDEH

  • Page 1 AE090JXEDEH AE120JXEDEH AE140JXEDEH AE160JXEDEH AE090JXEDGH AE120JXEDGH AE140JXEDGH AE160JXEDGH Air to Water Heat Pump Outdoor Unit installation manual imagine the possibilities Thank you for purchasing this Samsung product.
  • Page 2: Table Of Contents

    Contents PREPARATION Safety precautions ..................... . . 3 Product specifications .
  • Page 3: Safety Precautions

    In order to prevent electric shocks, fires or injuries, always stop the unit, disable the protection switch and contact SAMSUNG’s technical support if the unit produces smoke, if the power cable is hot or damaged or if the unit is very noisy.
  • Page 4 Safety precautions When you install the Air to water heat pump in a small room, you must consider a proper ventilation to prevent a leakage level within the maximum permissible limit. - In that case, you may die from suffocation by some possibility. Make sure to safely dispose of packing materials.
  • Page 5: Product Specifications

    Product specifications Product line-up Line-up Remark Chassis Heat pump units AE120JXEDEH AE140JXEDEH AE090JXEDEH AE160JXEDEH Model name AE090JXEDGH AE120JXEDGH AE140JXEDGH AE160JXEDGH Accessories Keep supplied accessories until the installation is finished. Hand the installation manual over to the customer after finishing installation.
  • Page 6: Outdoor Unit Specification

    Outdoor unit specification Type Unit AE090JXEDEH AE120JXEDEH AE140JXEDEH AE160JXEDEH 1P, 220~240 VAC Power source 1P, 220~240 VAC 50 Hz 50 Hz Weight (net/gross) 68.0/78.0 100.0/109.5 Size (WxHxD, net) 940 x 998 x 330 940 x 1,420 x 330 Noise 49/50 50/50 50/52 52/54 (Heat/Cool, Pressure) Operating Range °C...
  • Page 7: Main Components

    Main components Dimensions(Overall) Heat pump for R-410A. 1-Fan chassis AE090JXEDEH, AE090JXEDGH (Unit : mm) 2-Fan chassis AE120/140/160JXEDEH, AE120/140/160JXEDGH (Unit : mm) ENGLISH-7...
  • Page 8: Installing The Unit

    Installing the unit Deciding on where to install the outdoor unit Decide the installation location regarding the following condition and obtain the user’s approval. The outdoor unit must not be placed on its side or upside down, as the compressor lubrication oil will run into the cooling circuit and seriously damage the unit.
  • Page 9 Do not install the Air to Water Heat Pump in following places. • The place where there is mineral oil or arsenic acid. There is a chance that parts may get damaged due to burned resin. The capacity of the heat exchanger may reduce or the Air to Water Heat pump may be out of order. •...
  • Page 10 Installing the unit Space requirements for outdoor unit When installing 1 outdoor unit (Unit : mm) ❋ When the air outlet is opposite the wall ❋ When the air outlet is towards the wall 2,000 or more 300 or more 600 or more ❋...
  • Page 11 When installing more than 1 outdoor unit (Unit : mm) ❋ When the air outlet is towards the wall 300 or more 600 or more 600 or more 600 or more ❋ When 3 sides of the outdoor unit are blocked by the wall 300 or more 300 or more 600 or more...
  • Page 12 Installing the unit Outdoor unit installation The outdoor unit must be installed on a rigid and stable base to avoid any increase in the noise level and vibration, particularly if the outdoor unit is to be installed in a location exposed to strong winds or at a height, the unit must be fixed to an appropriate support(wall or ground).
  • Page 13 Drain work • General area While Air-Water Heat Pump is running in heating mode, Ice can begin accumulate on the surface of condenser. To prevent Ice from growing, system go into De-frost mode and then Ice on the surface changes to water. Dropped water from condenser shall be eliminated through running drain holes to prevent Ice growing at low temperature.
  • Page 14 Installing the unit • Heavy snow fall area (Natural drainage) When using the air conditioner in the heating mode, ice may accumulate. During de-icing (defrost operation), the condensed water must be drained off safely. For the air conditioner operates well, you must follow the instructions below. - Make space more than 80mm between the bottom of the outdoor unit and the ground for installation.
  • Page 15 Selecting a location in cold climates • When operating the unit in a low outdoor ambient temperature, be sure to follow the instructions described below. NOTE To prevent exposure to wind, install the unit with its suction side facing the wall. Never install the unit at a site where the suction side may be exposed directly to wind.
  • Page 16: Electrical Connections

    Electrical connections Overall system configuration Connection of the power cable (1 phase 2 wires) Distribution board Outdoor unit Hydro unit 1 phase 1 phase 1 phase 2 wires 2 wires 2 wires 220- 220- 220- 240 V ~ 240 V ~ 240 V ~ DHW tank MCCB+ ELCB...
  • Page 17: Connecting The Cable

    Connecting the cable Power cable specifications 1 phase Rated Voltage Range Outdoor unit Volts Min. Circuit Amps. Max. Fuse Amps. AE090JXEDEH 220-240 22 A 27.5 A AE120JXEDEH 220-240 28 A 35 A AE140JXEDEH 220-240 30 A 37.5 A AE160JXEDEH 220-240...
  • Page 18 Connecting the cable Specification of connection cables (common in use) Power supply Max/Min(V) Communation cable 1Φ, 220-240 V, 50 Hz ±10 % 0.75~1.5 mm², 2 wires 3Φ, 380-415 V, 50 Hz For Power Cable, use the grade H07RN-F or H05RN-F materials. When installing the indoor unit, outdoor unit use the double shielded (Tape aluminum / polyester braid + copper ) cable of FROHH2R type.
  • Page 19 Wiring diagram of power cable When using ELB for 1 phase and 3 phase 1 phase 1(L) 2(N) NOT USE Cable tie Power Supply Electrical component box Cable clamp MCCB Main power cable Communication cable MCCB 3 phase 1(L) 2(N) L1(R) L3(T) L2(S)
  • Page 20 Connecting the cable 1 phase 2 wires 1 phase Circuit breaker 1(L) 2(N) Earth cable (U-Trap) NOT USE Power cable Communication cable between Hydro Communication unit and outdoor units cable Earth Hydro unit 1 phase DHW Tank • When removing the outer cover of the power cable, use the appropriate tools to prevent damaging the inner cover.
  • Page 21 3 phase 4 wires 3 phase Circuit breaker 1(L) 2(N) L1(R) L2(S) L3(T) Earth cable (U-Trap) NOT USE Power cable Communication cable between Hydro and outdoor units Communication Earth cable Hydro unit L1(R) L2(S) L3(T) 3 phase • When removing the outer cover of the power cable, use the appropriate tools to prevent damaging the inner cover.
  • Page 22 Connecting the cable Connecting the power terminal Connect the cables to the terminal board using the compressed ring terminal. Connect the rated cables only. Connect using a wrench which is able to apply the rated torque to the screws. If the terminal is loose, fire may occur caused by arc. If the terminal is connected too firmly, the terminal may be damaged.
  • Page 23 How to connect your extended power cables 1. Prepare the following tools. Tools Crimping pliers Connection sleeve (mm) Insulation tape Contraction tube (mm) Spec MH-14 20xØ6.5(HxOD) Width 19mm 70xØ8.0(LxOD) Shape 2. As shown in the figure, peel off the shields from the rubber and wire of the Power cable power cable.
  • Page 24 Connecting the cable 5. Wrap it with the insulation tape twice or more and position your contraction tube in the middle of the insulation tape. Three or more layers of insulation are required. Method 1 Method 2 Insulation tape Insulation tape 40 mm 35 mm 6.
  • Page 25: Refrigerant Piping Work

    • Use the vacuum pump that the vacuum induction is available up to 5Torr. (-100.7kPa) Flare nut • Use only flare nut supplied with the product. Allowable length of the refrigerant pipe and the installation examples AE090JXEDEH, AE120JXEDEH, AE140JXEDEH, AE160JXEDEH, AE090JXEDGH, AE120JXEDGH, AE140JXEDGH, AE160JXEDGH Outdoor unit Item...
  • Page 26 Refrigerant piping work Selecting the refrigerant pipe Outer Minimum Liquid side Gas side Outdoor unit capacity (kW) diameter thickness Temper grade (mm) (mm) (mm) (mm) AE090JXEDEH ø6.35 ø15.88 ø 6.35 AE120JXEDEH ø9.52 ø15.88 ø 9.52 C1220T-0 AE140JXEDEH ø9.52 ø15.88 ø12.70 AE160JXEDEH ø9.52...
  • Page 27 3. To prevent a gas leak, remove all burrs at the cut edge of the pipe with a reamer. Burr Pipe • Face the pipe down while removing the burrs to make sure that burrs do not get in to the pipe. CAUTION Pipe cutter 4.
  • Page 28 Refrigerant piping work Selecting the insulator of the refrigerant pipe According to pipes size, insulate pipes on gas and liquid side by selecting appropriate insulations. Standard condition is under a temperature of 30 °C and a humidity of 85 %. If the units are installed in extreme weather conditions, select the insulator by table below.
  • Page 29 Insulating the refrigerant pipe Be sure to insulate the refrigerant pipe, joints and connections with class 'o' material. If you insulate the pipes, the condensed water does not fall from the pipes and the capacity of the Air to Water Heat Pump is improved.
  • Page 30 Refrigerant piping work Performing the refrigerant gas leak test Use a manifold gauge for R-410A to prevent the inflow of foreign substances and resist against the internal pressure. Pressure test with dry oxygen free nitrogen only. Apply pressure to the liquid side pipe and gas side If you apply pressure more than 4.1MPa, the pipes may be pipe with Nitrogen gas of 4.1 MPa (41.8 kgf/cm²) damaged.
  • Page 31 Manifold gauge Vacuum drying Use the tools for R-410A only to prevent the inflow of foreign substances and resist against the internal pressure. Low pressure side High Use the vacuum pump with the check valve to prevent pump oil from flowing pressure Service port backward while the vacuum pump is stopped suddenly.
  • Page 32 Refrigerant piping work Selecting additional refrigerant charge ❋ Basic charge The basic amount of refrigerant for outdoor unit charged in factory is: Outdoor unit (Series) Factory charge(kg) AE090JXEDEH AE120JXEDEH 2.98 AE140JXEDEH 2.98 AE160JXEDEH 2.98 AE090JXEDGH AE120JXEDGH 2.98 AE140JXEDGH 2.98 AE160JXEDGH 2.98...
  • Page 33 Charging refrigerant The R-410A refrigerant is blended refrigerant. Add only liquid refrigerant. Measure the quantity of the refrigerant according to the length of the liquid side pipe. Add quantity of the refrigerant using a scale. Important information: regulation regarding the refrigerant used This product contains fluorinated greenhouse gases.
  • Page 34 Refrigerant piping work Adding refrigerant The R-410A refrigerant is blended refrigerant. Add only liquid refrigerant. Measure the quantity of the refrigerant depending on the length of the liquid side pipe. Add fixed quantity of the refrigerant using a scale. ❋ Adding refrigerants in cooling conditions Manifold gauge Suction charging High...
  • Page 35 Adding the heating refrigerant 1) When recharging the heating refrigerant, connect the low pressure pipe from manifold gage to the suction charging port. 2) Press the function key for adding refrigerant in heating mode. 3) After 20 minutes of operation, open the valve on suction charge port. 4) Open the valve for low pressure side on the manifold gage to recharge the remaining refrigerant.
  • Page 36: Checking Correct Grounding

    Checking correct grounding If the power distribution circuit does not have a grounding or the grounding does not comply with specifications, an grounding electrode must be installed. The corresponding accessories are not supplied with the Air to Water Heat pump. 1.
  • Page 37 3. Press K1 or K2 on the outdoor unit PCB to run the test mode and stop. KEY operation 7-segment display " " " " "BLANK" "BLANK" Press once : Heating test run " " " " "BLANK" "BLANK" Press twice : Defrost test run Press 3times : Finishing test mode Press once : Cooling test run "...
  • Page 38 Setting the option switch and function of the keys Display Number of Display contents Units press Segment 1 Segment 2 Segment 3 Segment 4 Protective control Frequency status 0 : No protective control 0 : Normal 1 : Freezing 0 : Cooling 1 : Hold Protective control 2 : Defrosting...
  • Page 39 Setting the option 1. Press and hold K2 to enter the option setting. (Only available when the operation is stopped) - If you enter the option setting, display will show the following. - Seg1 and Seg2 will display the number for selected option. - Seg3 and Seg4 will display the number for set value of the selected option.
  • Page 40: Pump Down Procedure

    Pump down procedure Objective of pump down For product repairs and indoor unit relocation, pump down operation must be done recover the refrigerant into the outdoor unit. Cautions when performing pump down Product limits amount of refrigerant in the outdoor unit due to slim design. Collect the majority of the refrigerant in the system in an empty refrigerant vessel and perform a pump down operation with remaining refrigerant.
  • Page 41 Collecting refrigerant in refrigerant vessel before pump down operation If the amount of refrigerant in the system exceeded the maximum allowable limit, reduce the amount of the refrigerant by following the below instruction before pump down operation. 1. Prepare an exclusive rechargeable refrigerant vessel, scale and a manifold gauge. 2.
  • Page 42: Completing The Installation

    Completing the installation Check the following after completing the installation. • Check the external surface and the inside of the outdoor unit. • Is there any possibility of short circuit? Outdoor unit • Is the place well-ventilated and ensures space for service? •...
  • Page 43: Final Checks And Trial Operation

    Final checks and trial operation Inspection before test operation 1. Check the power cable and communication cable of the indoor and outdoor unit. 2. Check the power supply between the outdoor unit and the cabinet panel. - Check the 220-240 V~ / 380-415 V~ with the voltage meter. 3.
  • Page 44: Trouble Shooting

    Trouble shooting • Incorrect handling of thermostat, safety valve or other valves may lead to tank rupture. When servicing the unit follow instructions carefully: WARNING • Always turn off main power supply when water supply is being shut off. • Test the free operation of the safety valve regularly by opening the valve ensuring the water flows freely. •...
  • Page 45 Display Explanation Error Source [Inverter] Total current error/PFC over current error Outdoor Unit OLP is overheated Outdoor Unit [Inverter] IPM over current error Outdoor Unit Compressor overload error Outdoor Unit DC LINK over/low voltage error Outdoor Unit [Inverter] Compressor rotation error Outdoor Unit [Inverter] Current sensor error Outdoor Unit...
  • Page 46: Commission Regulation (Eu) No 813/2013

    If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-46...
  • Page 47 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-47...
  • Page 48 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-48...
  • Page 49 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-49...
  • Page 50 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-50...
  • Page 51 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-51...
  • Page 52 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-52...
  • Page 53 If Cdh is not determined by measurement then the default degradation coefficient is Cdh = 0.9. Precautions as described in the installation/user manual must be taken when assembling, installing and maintaining this product. If you are a professional looking for information on non-destructive disassembly and dismantling, please send an email to: erims.sec@samsung.com ENGLISH-53...
  • Page 54 COMMISSION REGULATION (EU) No 813/2013 English(EN) Bulgarian(BG) Spanish(ES) Czech(CS) REGLAMENTO (UE) No 813/2013 DE LA COMMISSION REGULATION (EU) No 813/2013 РЕГЛАМЕНТ (ЕС) № 813/2013 НА КОМИСИЯТА NAŘÍZENÍ KOMISE (EU) č. 813/2013 COMISIÓN ECODESIGN REQUIREMENTS FOR SPACE Изискванията за екопроектиране на Los requisitos de diseño ecológico de aparato Požadavky na ekodesign pro vytápění...
  • Page 55 неразрушително разглобяване и демонтаж, and dismantling, please send an email to: producto, por favor, diríjase a la siguiente demontáže produktu, napište e-mail na моля, изпратете имейл на адрес: erims.sec@ erims.sec@samsung.com dirección de correo electrónico: erims.sec@ adresu: erims.sec@samsung.com. samsung.com samsung.com ENGLISH-55...
  • Page 56 COMMISSION REGULATION (EU) No 813/2013 Danish(DA) German(DE) Estonian(ET) Greek(EL) KOMMISSIONENS FORORDNING (EU) Nr. VERORDNUNG (EU) Nr. 813/2013 DER ΚΑΝΟΝΙΣΜΌΣ (ΕΕ) αριθ. 813/2013 ΤΗΣ KOMISJONI MÄÄRUS (EL) nr 813/2013, 813/2013 KOMMISSION ΕΠΙΤΡΟΠΉΣ Kravene til miljøvenligt design af anlæg til Die Ökodesign-Anforderungen an Οι...
  • Page 57 αποσυναρμολόγηση χωρίς να προκληθούν støvsugeren uden at ødelægge nogle dele, benötigen, schreiben Sie bitte eine E-Mail an: demonteerimise kohta, saatke palun e-kiri καταστροφές, στείλτε μήνυμα ηλεκτρονικού bedes du sende en e-mail til: erims.sec@ erims.sec@samsung.com. aadressil: erims.sec@samsung.com. ταχυδρομείου στη διεύθυνση: erims.sec@ samsung.com samsung.com ENGLISH-57...
  • Page 58 COMMISSION REGULATION (EU) No 813/2013 French(FR) Croatian(HR) Italian(IT) Latvian(LV) RÈGLEMENT (UE) No 813/2013 DE LA REGOLAMENTO (UE) N. 813/2013 DELLA UREDBA KOMISIJE (EU) br. 813/2013 KOMISIJAS REGULA (ES) Nr. 813/2013 COMMISSION COMMISSIONE Le specifiche per la progettazione Les exigences d’ é coconception applicables Zahtjevi za ekološki dizajn grijač...
  • Page 59 à pošaljite elektroničku poruku na adresu: erims. il prodotto, invia una email all'indirizzo: erims. sūtiet e-pasta vēstuli uz adresi: erims.sec@ l'adresse: erims.sec@samsung.com sec@samsung.com sec@samsung.com samsung.com. ENGLISH-59...
  • Page 60 COMMISSION REGULATION (EU) No 813/2013 Lithuanian(LT) Hungarian(HU) Maltese(MT) Dutch(NL) REGOLAMENT TAL-KUMMISSJONI (UE) Nru VERORDENING (EU) Nr. 813/2013 VAN DE KOMISIJOS REGLAMENTAS (ES) Nr. 813/2013 A BIZOTTSÁG 813/2013/EU RENDELETE 813/2013 COMMISSIE Ekologinio projektavimo reikalavimai už A környezettudatos tervezésére vonatkozó De eisen inzake ecologisch ontwerp voor Rekwiżiti tal-ekodisinn għall ħiter tal-post patalpų...
  • Page 61 ENGLISH-61...
  • Page 62 COMMISSION REGULATION (EU) No 813/2013 Polish(PL) Portuguese(PT) Romanian(RO) Slovak(SK) REGULAMENTO (UE) N.o 813/2013 DA ROZPORZĄDZENIE KOMISJI (UE) NR 813/2013 NARIADENIE KOMISIE (EÚ) č. 813/2013 NARIADENIE KOMISIE (EÚ) č. 813/2013 COMISSÃO Wymogi dotyczące ekoprojektu dla Os requisitos de conceção ecológica para Požiadavky na ekodizajn tepelný...
  • Page 63 ENGLISH-63...
  • Page 64 COMMISSION REGULATION (EU) No 813/2013 Slovenian(SL) Finnish(FI) Swedish(SV) Srpski(SR) Türkçe(TR) KOMMISSIONENS FÖRORDNING (EU) KOMİSYON YÖNETMELİĞİ (AB) No UREDBA KOMISIJE (EU) št. 813/2013 KOMISSION ASETUS (EU) N:o 813/2013, UREDBA KOMISIJE (EU) Br. 813/2013 nr 813/2013 813/2013 Okoljsko primerno zasnovo zahteve za Ekosuunnitteluvaatimukset varten ZAHTEVI EKOLOŠKOG DIZAJNA ZA ALAN ISITICI İÇİN EKO-TASARIM...
  • Page 65 şu adrese bir e-posta gönderin: erims. erims.sec@samsung.com osoitteeseen erims.sec@samsung.com e-postmeddelande till: erims.sec@ na e-adresu: erims.sec@samsung.com sec@samsung.com samsung.com ENGLISH-65...
  • Page 66: Commission Delegated Regulation (Eu) No 811/2013

    COMMISSION DELEGATED REGULATION (EU) No 811/2013 PRODUCT FICHE (ENERGY LABELLING OF SPACE HEATERS) Samsung Electronics Samsung Electronics Samsung Electronics Samsung Electronics Supplier's name or trademark Co., Ltd. Co., Ltd. Co., Ltd. Co., Ltd. AE090JXEDEH/ AE090JXEDGH/ AE120JXEDEH/ AE120JXEDGH/ Supplier's model identifier...
  • Page 67 PRODUCT FICHE (ENERGY LABELLING OF PACKAGES OF SPACE HEATER) Samsung Electronics Samsung Electronics Samsung Electronics Samsung Electronics Supplier's name or trademark Co., Ltd. Co., Ltd. Co., Ltd. Co., Ltd. AE090JXEDEH/ AE090JXEDGH/ AE120JXEDEH/ AE120JXEDGH/ Supplier's model identifier AE090JNYDEH AE090JNYDGH AE160JNYDEH...
  • Page 68 COMMISSION DELEGATED REGULATION (EU) No 811/2013 English(EN) Bulgarian(BG) Spanish(ES) Czech(CS) COMMISSION DELEGATED REGULATION (EU) ДЕЛЕГИРАН РЕГЛАМЕНТ (ЕС) № 811/2013 НА REGLAMENTO DELEGADO (UE) No 811/2013 DE NAŘÍZENÍ KOMISE V PŘENESENÉ PRAVOMOCI No 811/2013 КОМИСИЯТА LA COMISIÓN (EU) č. 811/2013 PRODUCT FICHE (ENERGY LABELLING OF SPACE Продуктов...
  • Page 69 Danish(DA) German(DE) Estonian(ET) Greek(EL) KOMMISSIONENS DELEGEREDE FORORDNING DELEGIERTE VERORDNUNG (EU) Nr. 811/2013 KOMISJONI DELEGEERITUD MÄÄRUS (EL) nr ΚΑΤ' ΕΞΟΥΣΙΟΔΌΤΗΣΗ ΚΑΝΟΝΙΣΜΌΣ (ΕΕ) αριθ. (EU) Nr. 811/2013 DER KOMMISSION 811/2013 811/2013 ΤΗΣ ΕΠΙΤΡΟΠΉΣ Produktdatablad (energimærkning af anlæg til Produktdatenblatt (Energiekennzeichnung von Tootekirjeldus (energiamärgistusega kohta Δελτίο...
  • Page 70 COMMISSION DELEGATED REGULATION (EU) No 811/2013 French(FR) Croatian(HR) Italian(IT) Latvian(LV) RÈGLEMENT DÉLÉGUÉ (UE) No 811/2013 DE LA REGOLAMENTO DELEGATO N. 811/2013 DELLA DELEGIRANA UREDBA KOMISIJE (EU) br. 811/2013 KOMISIJAS DELEĢĒTĀ REGULA (ES) Nr. 811/2013 COMMISSION COMMISSIONE EUROPEA Fiche de produit (l’ é tiquetage énergétique des Informacijski list proizvoda (označivanja Scheda prodotto (l’...
  • Page 71 Lithuanian(LT) Hungarian(HU) Maltese(MT) Dutch(NL) KOMISIJOS DELEGUOTASIS REGLAMENTAS (ES) A BIZOTTSÁG 811/2013/EU FELHATALMAZÁSON REGOLAMENT TA’ DELEGA TAL-KUMMISSJONI GEDELEGEERDE VERORDENING (EU) Nr. 811/2013 Nr. 811/2013 ALAPULÓ RENDELETE (UE) Nru 811/2013 VAN DE COMMISSIE Gaminio vardinių parametrų lentelė (energijos Termékismertető adatlap (energiafogyasztásának L-iskeda tat-tagħrif tal-prodott (tikkettar Productkaart (de energie-etikettering van vartojimo efektyvumo ženklinimo dėl patalpų...
  • Page 72 COMMISSION DELEGATED REGULATION (EU) No 811/2013 Polish(PL) Portuguese(PT) Romanian(RO) Slovak(SK) ROZPORZĄDZENIE DELEGOWANE KOMISJI (UE) REGULAMENTO DELEGADO (UE) Nº 811/2013 DA REGULAMENTUL DELEGAT AL COMISIEI (UE) NR. DELEGOVANÉ NARIADENIE KOMISIE (EÚ) č. 811/2013 NR 811/2013 COMISSÃO 811/2013 Karta produktu (w odniesieniu do etykiet efektywności Ficha de produto (rotulagem energética dos Fișa produsului (ce privește clasa de energie a Informačný...
  • Page 73 Slovenian(SL) Finnish(FI) Swedish(SV) Srpski(SR) Turkish(TR) DELEGIRANA UREDBA KOMISIJE (EU) KOMISSION DELEGOITU ASETUS (EU) KOMMISSIONENS DELEGERADE DELEGIRANA UREDBA KOMISIJE (EU) KOMİSYON YETKİLİ YÖNETMELİĞİ (AB) št. 811/2013 N:o 811/2013 FÖRORDNING (EU) nr 811/2013 Br. 811/2013 No 811/2013 DOKUMENTACIJA O PROIZVODU Podatkovni list izdelka (energijskega Tuoteseloste (tilalämmittimien, Produktblad (energimärkning av pannor och ÜRÜN FİŞİ...
  • Page 74 SAMSUNG ELECTRONICS CO., LTD. 107, Hanamsandan 6beon-ro, Gwangsan-gu, Gwangju-si, Korea 62218 Samsung Electronics Service Department PO Box 12987, Blackrock, Co. Dublin. Ireland Blackbushe Business Park, Yateley, GU46 6GG. UK...