Pavilion PV Series Owner's Manual page 38

Condensing gas combi boiler
Table of Contents

Advertisement

Follow-up Service-2
Gas Conversion
If you move to a region that uses a different type of gas or if the local gas supply is converted,
replacement of the gas manifold and adjustment of the appliance will be necessary.
This work must be performed by either the manufacturer or a manufacturer's qualified service
agency and will be charged for even during the warranty period. The qualified installer will also be
responsible for purchasing the gas conversion kit directly from the manufacturer.
For more information, contact Pavilion Customer Center at 1-855-443-8468.
WARNING
The gas conversion kit shall be installed by a qualified service agency* in accordance with
the manufacturer's instructions and all applicable codes and requirements of the authority
having jurisdiction. The information in the instructions must be followed to minimize the risk
of fire or explosion or to prevent property damage, personal injury, or death. The qualified
service agency is responsible for the proper installation of this kit. The installation is not
proper and complete until the operation of the converted appliance is checked as specified in
the manufacturer's instructions supplied with the kit.
* A qualified service agency is any individual, firm, corporation, or company which either in person or through
a representative is engaged in and is responsible for the connection, utilization, repair or servicing of gas
utilization equipment or accessories; who is experienced in such work, familiar with all precautions required,
and has compiled with all of the requirements of the authority having jurisdiction.
Before the gas conversion is performed, verify the proper gas conversion kit on the table
provided below.
Conversion Kit Name
CONVERSION KIT PV LP TO NAT
CONVERSION KIT PV NAT TO LP
The following parts are supplied in the conversion kit. These items will replace the existing parts that
are currently installed in the unit. Make sure that all parts are replaced and properly installed by a
qualified service agency.
* An Operation Display and a digital gas manometer are required to complete the installation.
Do not proceed if this equipment is not immediately available.
After the necessary parts have been replaced on the unit, the Operation Display is then used to
adjust the settings on the Combi Boiler for use with the proper gas type.
The following pressure value are verified by the installer.
-The inlet gas pressure value at the gas supply inlet fitting
-The offset pressure value at the gas valve
Proper adjustments will be made to ensure safe and efficient operation.
Once this is completed, a final gas leak check will be performed to confirm that all parts have been
securely installed.
If you notice the smell of gas at any time after the installation has been completed, turn the Combi
Boiler off and contact your gas supplier immediately.
38
O-Ring × 2
Venturi Mixer Set
Stock Code
Conversion Type
18103
Propane to Natural Gas
18104
Natural Gas to Propane
Conversion Kit Label

Advertisement

Table of Contents
loading

Related Products for Pavilion PV Series

This manual is also suitable for:

Pv199dvGhq-c3201wx-ff pb us

Table of Contents