Download Print this page

Instal Ation Procedure - Lefroy Brooks M1-4203 Installation, Operating, & Maintenance Instructions

Three handle thermostatic rough with flow control & 2-way diverter, to suit m1-4404 & x1-2013

Advertisement

Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
Wall Surface
3 1/8"~4 1/8"
(80~105mm)
1
Before installing the valve into the wall, please note that a distance between 80mm~105mm
from the wall surface to the rear of the valve should be left so that the trim can be fitted
correctly.
2
Install valve assembly into the wall.
3
Cut a hole on the wall surface for fitting the trim kit. The hole dimension is as shown in figure 3.
4
Throw away the protective caps only when building construction is completed and you are ready
to fit the trim kit in.
REMOVE CAP ONLY, KEEP THE REST OF THE MUD GUARD AS IT IS NEEDED TO HOLD THE TRIM
FIXING SCREWS.
mixed water out #2
1
2-Ø(45~50)mm
3
mixed water out #1
HOT WATER - IN
REMOVE CAP ONLY, KEEP THE REST OF THE
MUD GUARD AS IT IS NEEDED TO HOLD THE
TRIM FIXING SCREWS.
Steps 1-4
COLD WATER - IN
mixed water out #3
2
4
4

Advertisement

loading