The prices charged by Bloomfield Industries for its products installation or eighteen (18) months from the date of shipment are based upon the limitations in this warranty.
EXPLODED VIEW & PARTS LIST ensure its optimum performance. WIRING DIAGRAM SPECIFICATIONS MODEL VOLTS WATTS AMPS POWER SUPPLY 1ø REQUIREMENTS 8783UK 3600 15.0 2 WIRE +GND MENNEKES ME332P6-1311 plug APPLICABILITY This manual applies to the following Bloomfield Industries products: 8783UK...
PRECAUTIONS AND GENERAL INFORMATION WARNING: Electric Shock Hazard All servicing requiring access to non-insulated components must be performed by qualified service personnel. Do not open any access panels which require the use of tools. Failure to heed this warning can result in electrical shock. WARNING: Injury Hazard All installation procedures must be performed by qualified personnel with full knowledge of all applicable electrical and plumbing codes.
1/4-turn ball valve, to avoid loss of water flow thru the must meet certain minimum valve. criteria to insure successful operation of the brewer. Bloomfield recommends 1/4" copper tubing for installation of less than 12 feet and 3/8" for more than 12 feet from a 1/2" water supply line.
Page 7
IMPORTANT: Do not connect brewer to electrical power until Model 8783UK requires a dedicated 220 to 240 volt 20 amp you are ready to fill the tank. circuit (L1, L2) plus ground.
OPERATION Fig. 4 Brewer Operation Diagram A. START-UP IMPORTANT: For initial start-up, or if the brewer has not been used for an Tanks must be full of extended period of time: water before pressing ♦ Be sure spray disk and brew gasket are properly installed in the either TANK HEATER brew head.
Page 9
OPERATION (continued) WATER HEATER Separate coffee brew water and faucet water heater systems are identical. Each heating element is protected from over-temperature by a manual reset hi-limit safety thermostat. Water temperature is sensed by a thermobulb inserted into each water tank. This temperature signal is fed to the corresponding thermostat, which controls line power to that tank's heating element.
BREWING COFFEE A. PREPARATION CAUTION: Burn Hazard Place one (1) genuine Bloomfield paper filter in the brew chamber. Exposed surfaces of the Add a pre-measured amount of brewer, brew chamber and fresh coffee grounds. decanter may be HOT to Gently shake the brew chamber to the touch, and can cause level the bed of grounds.
CLEANING INSTRUCTIONS PROCEDURE: Clean Coffee Brewer CAUTION: Burn Hazard PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. Brewing and serving temperatures of coffee are FREQUENCY: Daily extremely hot. Hot coffee will cause TOOLS: Mild Detergent, Clean Soft Cloth or Sponge serious skin burns.
Repair/replace as needed Coffee level too high or low Timer out of adjustment Adjust controller Brew chamber overflows Too many filter papers or wrong Use one (1) genuine Bloomfield filter paper filter per brew Brew chamber dispense hole Thoroughly clean brew plugged...
SERVICING INSTRUCTIONS ACCESS PANELS CAUTION Electric Shock TOP PANEL: Hazard Remove top panel to access hot water tanks, thermostats, Opening access panels or thermo probe, heating elements and main power switch. removing warmer plates on this Top panel is held by a retaining lip at the front and two screws brew may expose uninsulated near the middle top.
Page 14
SERVICING INSTRUCTIONS (continued) TEMPERATURE ADJUSTMENT CAUTION Electric Shock Unplug power cord or turn circuit breaker OFF. Remove top Hazard panel. Pull vent tube out of tank lid and insert a thermometer of known These procedures involve accuracy in hole. Reconnect brewer to electrical power. exposed electrical circuits.
Page 15
SERVICING INSTRUCTIONS (continued) IMPORTANT: Water pressure BREW TIME ADJUSTMENT must be between 20 p.s.i and The amount of water dispensed automatically during a brew cycle 90 p.s.i. flowing pressure. is controlled by the BREW TIMER. If water pressure exceeds this value, or if water pressure Place empty decanter under the brew chamber.
Should deliming then reinstall lid clamps. hoses become necessary, 8. Reinstall wiring to heating element and thermostat. Bloomfield recommends Verify that all internal components are dry, then reinstall the replacing the hoses. top panel. 10. Reconnect brewer to electrical supply and reconnect water supply.
Page 17
Should deliming 8. Reinstall wiring to heating element and thermostat. hoses become necessary, Verify that all internal components are dry, then reinstall the Bloomfield recommends top panel. replacing the hoses. 10. Reconnect brewer to electrical supply and reconnect water supply.
Page 22
Bloomfield Industries, Inc. Division of Carrier Commercial Refrigeration In US and Canada Telephone: 775-698-5700 Fax: 888-492-2783 Fax: 800-356-5142 ( for orders only website: www.wellsbloomfield.com...
Need help?
Do you have a question about the 8783UK and is the answer not in the manual?
Questions and answers