Page 1
HOT WATER DRAW FAUCET MODEL: 8783D3FM Includes: Installation Operation Use & Care Servicing Instructions This instruction is for the exclusive use of licensees and employees of McDonalds Systems, Inc. Model 8783D3FM Brewer with optional 8900-Series Decanters Z15131 p/n 2m- Rev. - M915 0902...
The prices charged by Bloomfield Industries for its products original installation or eighteen (18) months from the date of are based upon the limitations in this warranty. Seller’s...
WIRING DIAGRAMS appliance in a manner which will ensure its optimum performance. SPECIFICATIONS MODEL VOLTS WATTS AMPS POWER SUPPLY 1ø REQUIREMENTS 8783D3FM 220-240 3900 16.2 2 WIRE +GND Not provided APPLICABILITY This manual applies to the following Bloomfield product: 8783D3FM...
PRECAUTIONS AND GENERAL INFORMATION WARNING: ELECTRIC SHOCk HAzARD All servicing requiring access to non-insulated components must be performed by qualified service personnel. Do not open any access panels which require the use of tools. Failure to heed this warning can result in electrical shock. WARNING: INjURY HAzARD All installation procedures must be performed by qualified personnel with full knowledge of all...
Page 6
Install with FLOW criteria to insure successful arrow marking on strainer body pointing toward brewer. operation of the brewer. Bloomfield recommends 1/4” copper tubing for installation of less than 12 feet and 3/8” for more than 12 feet from a 1/2”...
IMPORTANT: Before connecting to electricity, make sure automatic brewers are connected to the water supply. IMPORTANT: Do not connect Model 8783D3FM requires a dedicated 220 to 240 volt 20 amp brewer to electrical power until circuit (L1, L2) plus ground.
OPERATION IL2326 Fig. 4 Brewer Operation Diagram START-UP IMPORTANT: Tanks must be full of For initial start-up, or if the brewer has not been used for an water before pressing extended period of time: either TANK HEATER • Be sure spray disk and brew gasket are properly installed in the SWITCH “...
Page 9
OPERATION (continued) WATER HEATER Separate coffee brew water and faucet water heater systems are identical. Each heating element is protected from over-temperature by a manual reset hi-limit safety thermostat. Water temperature is sensed by a thermobulb inserted into each water tank.
BREWING COFFEE A. PREPARATION CAUTION: BURN HAzARD Place one (1) genuine Bloomfield paper filter in the brew chamber. Exposed surfaces of the Add a pre-measured amount of brewer, brew chamber and fresh coffee grounds. decanter may be HOT to Gently shake the brew chamber to the touch, and can cause level the bed of grounds.
CLEANING INSTRUCTIONS CAUTION: PROCEDURE: Clean Coffee Brewer BURN HAzARD PRECAUTIONS: Disconnect brewer from electric power. Allow brewer to cool. Brewing and serving temperatures of coffee are FREQUENCY: Daily extremely hot. Hot coffee will cause TOOLS: Mild Detergent, Clean Soft Cloth or Sponge serious skin burns.
Repair/replace as needed Coffee level too high or low Timer out of adjustment Adjust timer Use one (1) genuine Bloomfield filter per Too many filter papers or wrong filter paper brew Brew chamber overflows Brew chamber dispense hole plugged...
SERVICING INSTRUCTIONS ACCESS PANELS CAUTION SHOCk HAzARD TOP PANEL: Remove top panel to access hot water tanks, thermostats, Opening access panels or thermo probe, heating elements and main power switch. removing warmer plates on this Top panel is held by a retaining lip at the front and two brew may expose uninsulated screws near the middle top.
Page 14
SERVICING INSTRUCTIONS (continued) TEMPERATURE ADjUSTMENT CAUTION: Thermostat control may be accessed by removing either of the SHOCk HAzARD two button plugs on the right side of the brewer. Front control is COFFEE BREW temperature; rear control is FAUCET WATER These procedures involve temperature.
Page 15
SERVICING INSTRUCTIONS (continued) IMPORTANT: Water pressure BREW TIME ADjUSTMENT must be between 20 p.s.i and Remove brew chamber and button plug. Adjust TIMER shaft; 90 p.s.i. flowing pressure. clockwise increases time. Brewer should dispense one full If water pressure exceeds this decanter of water.
Page 16
Make sure the gasket is properly in place, delimed. Should deliming hoses then reinstall lid clamps. become necessary, Bloomfield 8. Reinstall wiring to heating element and thermostat. recommends replacing the Verify that all internal components are dry, then reinstall the hoses.
Page 17
Should deliming hoses 10. Reconnect brewer to electrical supply and reconnect water become necessary, Bloomfield supply. recommends replacing the 11. Run and discard at least three full decanters of water from hoses.
Need help?
Do you have a question about the 8783D3FM and is the answer not in the manual?
Questions and answers