Fig. 49: Installing The Cartridge Group; Table 40: Tightening Torque (51007) - ABB A130-M65 Operation Manual

Hide thumbs Also See for A130-M65:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8 Dismantling and fitting / 8.14 Installing the cartridge group
Installing the cartridge group
Fig. 49: Installing the cartridge group
Part number
51007
Table 40: Tightening torque (51007)
1. Coat the threads of the studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group with the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Install the fastening strips (51002) with Verbus Ripp®discs (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
© Copyright 2018 ABB. All rights reserved.
A130
A135
M8
M10
25 Nm
45 Nm
HZTL4031_EN
A140
A145
M12
M12
75 Nm
75 Nm
Revision G
October 2018

Advertisement

Table of Contents
loading

Table of Contents