Installing The Cartridge Group; Fig. 48: Lifting The Cartridge Group And Rotating It - ABB A130-M65 Operation Manual

Hide thumbs Also See for A130-M65:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8 Dismantling and fitting / 8.14 Installing the cartridge group
8.14

Installing the cartridge group

Lifting the cartridge group and rotating it by 90°
Fig. 48: Lifting the cartridge group and rotating it by 90°
1. Loosen and remove nuts.
2. Lift the cartridge group out of the service support (90012).
3. Insert the screws of the service support from above and fit ring nuts (VRM) with washers.
4. Attach lifting gear to the ring nuts (VRM).
5. Lift cartridge group at the side of the ring nuts (VRM) and turn it into a vertical position.
© Copyright 2018 ABB. All rights reserved.
HZTL4031_EN
Revision G
October 2018

Advertisement

Table of Contents
loading

Table of Contents